A new precast wall connection subjected to monotonic loading
Final construction project cost is significantly determined by construction rate. The Industrialized Building System (IBS) was promoted to enhance the importance of prefabrication technology rather than conventional methods in construction. Ensuring the stability of a building constructed by using I...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Techno-Press
2016
|
Online Access: | http://psasir.upm.edu.my/id/eprint/54880/1/A%20new%20precast%20wall%20connection%20subjected%20to%20monotonic%20loading.pdf http://psasir.upm.edu.my/id/eprint/54880/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Putra Malaysia |
Language: | English |