Analysis potential benefit of energy cost the chiller plant operation engaging with tariff scheme
Engagement with new tariff scheme, Enhanced Time of Use (EToU) after switching from old tariff scheme, Time of Use (ToU) for chiller plant operation may be not promising a significant benefit for consumer in term of techno-economic value or even getting worse. This uncertainty condition make consume...
Saved in:
Main Authors: | , , , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
IOP Publishing
2020
|
Online Access: | http://psasir.upm.edu.my/id/eprint/87873/1/ABSTRACT.pdf http://psasir.upm.edu.my/id/eprint/87873/ https://iopscience.iop.org/article/10.1088/1742-6596/1529/5/052056 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Putra Malaysia |
Language: | English |