Scheduling With Alternatives Machine Using Fuzzy Inference System And Genetic Algorithm.
As the manufacturing activities in today's industries are getting more and more complex, it is required for the manufacturing company to have a good shop floor production scheduling to plan and schedule their production orders. Industri pengeluarcim kini telah berkembang pesat dan aktiviti p...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Monograph |
Published: |
Universiti Sains Malaysia
2008
|
Subjects: | |
Online Access: | http://eprints.usm.my/10511/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Sains Malaysia |
Summary: | As the manufacturing activities in today's industries are getting more and more complex, it is required for the manufacturing company to have a good shop floor production scheduling to plan and schedule their production orders.
Industri pengeluarcim kini telah berkembang pesat dan aktiviti pengeluarannya semakin kompleks, dengan itu syarikat pengeluar memerlukan jadual lantai
pengeluaran (shop floor) yang terbaik untuk merancang permintaan pengeluaran (product).
|
---|