Identification of Critical Variables in Cost Estimating for Building Conservation Works.
As conservation works gain popularity in recent years, the issue of inaccurate estimation of conservation cost has become more apparent. Although estimators are able to accurately estimate the cost of a new building, the same cannot be said for building conservation works. Conservation works are com...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Published: |
Universiti Sains Malaysia
|
Subjects: | |
Online Access: | http://eprints.usm.my/32998/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Sains Malaysia |
Summary: | As conservation works gain popularity in recent years, the issue of inaccurate estimation of conservation cost has become more apparent. Although estimators are able to accurately estimate the cost of a new building, the same cannot be said for building conservation works. Conservation works are complex,non-standard and the scope of works depends on the conditions of each Individual building.
Sejak kebelakangan ini, isu penganggaran kos yang kurang tepat bagi kerja pemuliharaan bangunan menjadi semakin ketara apabi/a semakin banyak kerja pemuliharaan dija/ankan. Wa/aupun penganggar kos dapat membuat anggaran yang tepat untuk bangunan baru tetapi hal ini tidak berlaku da/am penganggaran kos kerja pemuliharaan bangunan.
|
---|