Sim-boost: an alternative technique for measuring labour productivity at construction sites

Previous studies showed that labour productivity level has continuously been low at construction sites. One of the appropriate approaches for improving the labour productivity is by implementing the industrialised building system. However, this approach is fewer implemented globally in the constr...

Full description

Saved in:
Bibliographic Details
Main Author: Hanafi, Mohd Hanizun
Format: Conference or Workshop Item
Language:English
Published: 2008
Subjects:
Online Access:http://eprints.usm.my/34827/1/HBP24.pdf
http://eprints.usm.my/34827/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Sains Malaysia
Language: English