Sim-boost: an alternative technique for measuring labour productivity at construction sites
Previous studies showed that labour productivity level has continuously been low at construction sites. One of the appropriate approaches for improving the labour productivity is by implementing the industrialised building system. However, this approach is fewer implemented globally in the constr...
Saved in:
Main Author: | |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://eprints.usm.my/34827/1/HBP24.pdf http://eprints.usm.my/34827/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Sains Malaysia |
Language: | English |