A Comparison Between Predicted And Actual Performances Of An Embankment Built Over A Stone Column Area

In stone column experiences, actual settlements, consolidation times, and other performance indicators often disagree with the predicted ones. In this study, measurements particularly on actual settlements and consolidation times were made on an embankment built over stone columns. The area of st...

Full description

Saved in:
Bibliographic Details
Main Author: Ridha, Ahmed Dhya’a M.
Format: Thesis
Language:English
Published: 2013
Subjects:
Online Access:http://eprints.usm.my/43217/1/Ahmed%20Dhya%E2%80%99a%20M.%20Ridha24.pdf
http://eprints.usm.my/43217/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Sains Malaysia
Language: English
id my.usm.eprints.43217
record_format eprints
spelling my.usm.eprints.43217 http://eprints.usm.my/43217/ A Comparison Between Predicted And Actual Performances Of An Embankment Built Over A Stone Column Area Ridha, Ahmed Dhya’a M. TA1-2040 Engineering (General). Civil engineering (General) In stone column experiences, actual settlements, consolidation times, and other performance indicators often disagree with the predicted ones. In this study, measurements particularly on actual settlements and consolidation times were made on an embankment built over stone columns. The area of study, situated at Kodiang, Kedah, as a part of the electrified double track project between Ipoh to Padang Besar, consisted of Zone 1 and Zone 2. The embankment over Zone 1 was 4 m thick, while that of Zone 2 was 2 m thick. The underlying soil material was marine clay of northern region of Peninsular Malaysia. The consolidation time allowed for embankments in the project was 45 days after achieving top surcharge levels. The rapid gain in bearing capacity of the treated soil and embankment stability achieved due to the improved soil were also assessed. Other behaviors noted were change in pore pressures and lateral displacements of soil under loads. Extensive soil investigation and instrumentation have been carried out in the study particularly to compare between actual and predicted behavior of the embankments. It was found that actual field settlements were generally lesser than predicted. 2013-02 Thesis NonPeerReviewed application/pdf en http://eprints.usm.my/43217/1/Ahmed%20Dhya%E2%80%99a%20M.%20Ridha24.pdf Ridha, Ahmed Dhya’a M. (2013) A Comparison Between Predicted And Actual Performances Of An Embankment Built Over A Stone Column Area. Masters thesis, Universiti Sains Malaysia.
institution Universiti Sains Malaysia
building Hamzah Sendut Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Sains Malaysia
content_source USM Institutional Repository
url_provider http://eprints.usm.my/
language English
topic TA1-2040 Engineering (General). Civil engineering (General)
spellingShingle TA1-2040 Engineering (General). Civil engineering (General)
Ridha, Ahmed Dhya’a M.
A Comparison Between Predicted And Actual Performances Of An Embankment Built Over A Stone Column Area
description In stone column experiences, actual settlements, consolidation times, and other performance indicators often disagree with the predicted ones. In this study, measurements particularly on actual settlements and consolidation times were made on an embankment built over stone columns. The area of study, situated at Kodiang, Kedah, as a part of the electrified double track project between Ipoh to Padang Besar, consisted of Zone 1 and Zone 2. The embankment over Zone 1 was 4 m thick, while that of Zone 2 was 2 m thick. The underlying soil material was marine clay of northern region of Peninsular Malaysia. The consolidation time allowed for embankments in the project was 45 days after achieving top surcharge levels. The rapid gain in bearing capacity of the treated soil and embankment stability achieved due to the improved soil were also assessed. Other behaviors noted were change in pore pressures and lateral displacements of soil under loads. Extensive soil investigation and instrumentation have been carried out in the study particularly to compare between actual and predicted behavior of the embankments. It was found that actual field settlements were generally lesser than predicted.
format Thesis
author Ridha, Ahmed Dhya’a M.
author_facet Ridha, Ahmed Dhya’a M.
author_sort Ridha, Ahmed Dhya’a M.
title A Comparison Between Predicted And Actual Performances Of An Embankment Built Over A Stone Column Area
title_short A Comparison Between Predicted And Actual Performances Of An Embankment Built Over A Stone Column Area
title_full A Comparison Between Predicted And Actual Performances Of An Embankment Built Over A Stone Column Area
title_fullStr A Comparison Between Predicted And Actual Performances Of An Embankment Built Over A Stone Column Area
title_full_unstemmed A Comparison Between Predicted And Actual Performances Of An Embankment Built Over A Stone Column Area
title_sort comparison between predicted and actual performances of an embankment built over a stone column area
publishDate 2013
url http://eprints.usm.my/43217/1/Ahmed%20Dhya%E2%80%99a%20M.%20Ridha24.pdf
http://eprints.usm.my/43217/
_version_ 1643710690802794496