Penyelakuan Sistem Saliran Ribut Untuk Kompleks Industri Perai Menggunakan Storm Water Management Model (XP-SWMM)
The Storm Water Management Model (SWMM) is applied in this project to develop a model for an urban drainage system to analysis runoff quantity for Kompleks Industri Perai. The Storm Water Management Model (SWMM) was developed for the EPA between 1969 and 1971 and was the first comprehensive mo...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Sains Malaysia
2005
|
Subjects: | |
Online Access: | http://eprints.usm.my/57407/1/Penyelakuan%20Sistem%20Saliran%20Ribut%20Untuk%20Kompleks%20Industri%20Perai%20Menggunakan%20Storm%20Water%20Management%20Model%20%28XP-SWMM%29_Masita%20Mahat.pdf http://eprints.usm.my/57407/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Sains Malaysia |
Language: | English |
id |
my.usm.eprints.57407 |
---|---|
record_format |
eprints |
spelling |
my.usm.eprints.57407 http://eprints.usm.my/57407/ Penyelakuan Sistem Saliran Ribut Untuk Kompleks Industri Perai Menggunakan Storm Water Management Model (XP-SWMM) Mahat, Masita T Technology TA Engineering (General). Civil engineering (General) The Storm Water Management Model (SWMM) is applied in this project to develop a model for an urban drainage system to analysis runoff quantity for Kompleks Industri Perai. The Storm Water Management Model (SWMM) was developed for the EPA between 1969 and 1971 and was the first comprehensive model for urban runoff analysis. This model can simulate all aspects of the urban hydrologic and water quality cycles, including rainfall, snowmelt, surface and subsurface runoff, flow routing through the drainage network, storage and treatment. In this project, an urban drainage system model is developed to analyse the discharges of urban storm water runoff for Kompleks Industri Perai. The simulations were performed using design rainfall for 10 years ARI and 50 years ARI. The results from both simulations can be analyzed and compared. The analysis of water quantity gives the maximum discharges flows of 24.93 m3/s for 10 years ARI and 26.98 m3/s for 50 years ARI. Universiti Sains Malaysia 2005-04-01 Monograph NonPeerReviewed application/pdf en http://eprints.usm.my/57407/1/Penyelakuan%20Sistem%20Saliran%20Ribut%20Untuk%20Kompleks%20Industri%20Perai%20Menggunakan%20Storm%20Water%20Management%20Model%20%28XP-SWMM%29_Masita%20Mahat.pdf Mahat, Masita (2005) Penyelakuan Sistem Saliran Ribut Untuk Kompleks Industri Perai Menggunakan Storm Water Management Model (XP-SWMM). Project Report. Universiti Sains Malaysia, Pusat Pengajian Kejuruteraan Awam. (Submitted) |
institution |
Universiti Sains Malaysia |
building |
Hamzah Sendut Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Sains Malaysia |
content_source |
USM Institutional Repository |
url_provider |
http://eprints.usm.my/ |
language |
English |
topic |
T Technology TA Engineering (General). Civil engineering (General) |
spellingShingle |
T Technology TA Engineering (General). Civil engineering (General) Mahat, Masita Penyelakuan Sistem Saliran Ribut Untuk Kompleks Industri Perai Menggunakan Storm Water Management Model (XP-SWMM) |
description |
The Storm Water Management Model (SWMM) is applied in this project to
develop a model for an urban drainage system to analysis runoff quantity for Kompleks
Industri Perai. The Storm Water Management Model (SWMM) was developed for the
EPA between 1969 and 1971 and was the first comprehensive model for urban runoff
analysis. This model can simulate all aspects of the urban hydrologic and water quality
cycles, including rainfall, snowmelt, surface and subsurface runoff, flow routing
through the drainage network, storage and treatment. In this project, an urban drainage
system model is developed to analyse the discharges of urban storm water runoff for
Kompleks Industri Perai. The simulations were performed using design rainfall for 10
years ARI and 50 years ARI. The results from both simulations can be analyzed and
compared. The analysis of water quantity gives the maximum discharges flows of
24.93 m3/s for 10 years ARI and 26.98 m3/s for 50 years ARI. |
format |
Monograph |
author |
Mahat, Masita |
author_facet |
Mahat, Masita |
author_sort |
Mahat, Masita |
title |
Penyelakuan Sistem Saliran Ribut Untuk Kompleks Industri Perai Menggunakan Storm Water Management Model (XP-SWMM) |
title_short |
Penyelakuan Sistem Saliran Ribut Untuk Kompleks Industri Perai Menggunakan Storm Water Management Model (XP-SWMM) |
title_full |
Penyelakuan Sistem Saliran Ribut Untuk Kompleks Industri Perai Menggunakan Storm Water Management Model (XP-SWMM) |
title_fullStr |
Penyelakuan Sistem Saliran Ribut Untuk Kompleks Industri Perai Menggunakan Storm Water Management Model (XP-SWMM) |
title_full_unstemmed |
Penyelakuan Sistem Saliran Ribut Untuk Kompleks Industri Perai Menggunakan Storm Water Management Model (XP-SWMM) |
title_sort |
penyelakuan sistem saliran ribut untuk kompleks industri perai menggunakan storm water management model (xp-swmm) |
publisher |
Universiti Sains Malaysia |
publishDate |
2005 |
url |
http://eprints.usm.my/57407/1/Penyelakuan%20Sistem%20Saliran%20Ribut%20Untuk%20Kompleks%20Industri%20Perai%20Menggunakan%20Storm%20Water%20Management%20Model%20%28XP-SWMM%29_Masita%20Mahat.pdf http://eprints.usm.my/57407/ |
_version_ |
1761617395840974848 |