Overall equipment efficiency improvement using time study in an aerospace industry

This paper highlights a methodology used to improve the Overall Equipment Efficiency (OEE) of the autoclave process through the implementation of time studies. In this paper, two types of time study are employed where the initial time study conducted was the direct stopwatch time study used to valid...

Full description

Saved in:
Bibliographic Details
Main Authors: A. Perumal, Puvanasvaran, Chiang, Ze Mei, Andiappan, Alagendran
Format: Article
Language:English
Published: Elsevier Ltd 2013
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/10802/1/MITC_paper.pdf
http://eprints.utem.edu.my/id/eprint/10802/
https://www.sciencedirect.com/science/article/pii/S187770581302033X
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknikal Malaysia Melaka
Language: English