Exploring The Overall Equipment Effectiveness (OEE) In An Industrial Manufacturing Plant

This study intended to apply Overall Equipment Effectiveness (OEE) as a performance measurement tool to measure the effectiveness and performance of the machines in the selected manufacturing plant. For the purpose of this study, three machines were selected from the manufacturing plant. Apart from...

Full description

Saved in:
Bibliographic Details
Main Authors: Abdul Majid, Izaidin, Ngadiman, Yunos, Hussin , Burairah
Format: Conference or Workshop Item
Language:English
Published: 2013
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/11548/1/Exploring_The_Overall_Equipment_Effectiveness_%28OEE%29_In_An_Industrial_Manufacturing_Plant.pdf
http://eprints.utem.edu.my/id/eprint/11548/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknikal Malaysia Melaka
Language: English
id my.utem.eprints.11548
record_format eprints
spelling my.utem.eprints.115482015-05-28T04:18:18Z http://eprints.utem.edu.my/id/eprint/11548/ Exploring The Overall Equipment Effectiveness (OEE) In An Industrial Manufacturing Plant Abdul Majid, Izaidin Ngadiman, Yunos Hussin , Burairah HD28 Management. Industrial Management This study intended to apply Overall Equipment Effectiveness (OEE) as a performance measurement tool to measure the effectiveness and performance of the machines in the selected manufacturing plant. For the purpose of this study, three machines were selected from the manufacturing plant. Apart from this, the issues and factors affecting the OEE figures were discussed as part of the findings. A case study approach was chosen to conduct the study. This study employed quantitative method to conduct the analysis part of the study where empirical data will be computed to provide typical information for decision making. The primary findings of this study were the possible factors that dominantly affect the equipment effectiveness in the selected manufacturing plant. These findings were used to serve as a guideline to improve the existing problem for the selected machines. Ultimately, it was recommended that the selected manufacturing plant employs OEE as their primary performance measurement tool. 2013-08-28 Conference or Workshop Item PeerReviewed application/pdf en http://eprints.utem.edu.my/id/eprint/11548/1/Exploring_The_Overall_Equipment_Effectiveness_%28OEE%29_In_An_Industrial_Manufacturing_Plant.pdf Abdul Majid, Izaidin and Ngadiman, Yunos and Hussin , Burairah (2013) Exploring The Overall Equipment Effectiveness (OEE) In An Industrial Manufacturing Plant. In: The 2nd International Conference on Global Optimization and Its Applications (ICoGOIA2013), 28-29 August 2013, Legacy Melaka Hotel, Melaka..
institution Universiti Teknikal Malaysia Melaka
building UTEM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknikal Malaysia Melaka
content_source UTEM Institutional Repository
url_provider http://eprints.utem.edu.my/
language English
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
Abdul Majid, Izaidin
Ngadiman, Yunos
Hussin , Burairah
Exploring The Overall Equipment Effectiveness (OEE) In An Industrial Manufacturing Plant
description This study intended to apply Overall Equipment Effectiveness (OEE) as a performance measurement tool to measure the effectiveness and performance of the machines in the selected manufacturing plant. For the purpose of this study, three machines were selected from the manufacturing plant. Apart from this, the issues and factors affecting the OEE figures were discussed as part of the findings. A case study approach was chosen to conduct the study. This study employed quantitative method to conduct the analysis part of the study where empirical data will be computed to provide typical information for decision making. The primary findings of this study were the possible factors that dominantly affect the equipment effectiveness in the selected manufacturing plant. These findings were used to serve as a guideline to improve the existing problem for the selected machines. Ultimately, it was recommended that the selected manufacturing plant employs OEE as their primary performance measurement tool.
format Conference or Workshop Item
author Abdul Majid, Izaidin
Ngadiman, Yunos
Hussin , Burairah
author_facet Abdul Majid, Izaidin
Ngadiman, Yunos
Hussin , Burairah
author_sort Abdul Majid, Izaidin
title Exploring The Overall Equipment Effectiveness (OEE) In An Industrial Manufacturing Plant
title_short Exploring The Overall Equipment Effectiveness (OEE) In An Industrial Manufacturing Plant
title_full Exploring The Overall Equipment Effectiveness (OEE) In An Industrial Manufacturing Plant
title_fullStr Exploring The Overall Equipment Effectiveness (OEE) In An Industrial Manufacturing Plant
title_full_unstemmed Exploring The Overall Equipment Effectiveness (OEE) In An Industrial Manufacturing Plant
title_sort exploring the overall equipment effectiveness (oee) in an industrial manufacturing plant
publishDate 2013
url http://eprints.utem.edu.my/id/eprint/11548/1/Exploring_The_Overall_Equipment_Effectiveness_%28OEE%29_In_An_Industrial_Manufacturing_Plant.pdf
http://eprints.utem.edu.my/id/eprint/11548/
_version_ 1665905468548055040