The requirements for a dynamic bus crew scheduling system
Bus crew scheduling problem is a complex problem because of the large number oi variables that are needed to be considered for Optimisation, such as complexity of allocating crew shifts; rising costs of crew; and unpredictability of traffic and crew availability. There is a number of existing sched...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utem.edu.my/id/eprint/13054/2/SamadJournal2008.pdf http://eprints.utem.edu.my/id/eprint/13054/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknikal Malaysia Melaka |
Language: | English |