A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system
The advancement of technology had encouraged mankind to design and create useful equipment and devices. These equipment enable users to fully utilize them in various applications. Pulp mill is one of the heavy industries that consumes large amount of electricity in its production. Due to this,...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English English English |
Published: |
2014
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/1709/1/24p%20ZARINA%20IBRAHIM.pdf http://eprints.uthm.edu.my/1709/2/ZARINA%20IBRAHIM%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/1709/3/ZARINA%20IBRAHIM%20WATERMARK.pdf http://eprints.uthm.edu.my/1709/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Tun Hussein Onn Malaysia |
Language: | English English English |
id |
my.uthm.eprints.1709 |
---|---|
record_format |
eprints |
spelling |
my.uthm.eprints.17092021-10-04T08:45:44Z http://eprints.uthm.edu.my/1709/ A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system Ibrahim, Zarina TK Electrical engineering. Electronics Nuclear engineering TK1001-1841 Production of electric energy or power. Powerplants. Central stations The advancement of technology had encouraged mankind to design and create useful equipment and devices. These equipment enable users to fully utilize them in various applications. Pulp mill is one of the heavy industries that consumes large amount of electricity in its production. Due to this, any malfunction of the equipment might cause mass losses to the company. In particular, the breakdown of the generator would cause other generators to be overloaded. In the meantime, the subsequence loads will be shed until the generators are sufficient to provide the power to other loads. Once the fault had been fixed, the load shedding scheme can be deactivated. Thus, load shedding scheme is the best way in handling such condition. Selected load will be shed under this scheme in order to protect the generators from being damaged. Multi Criteria Decision Making (MCDM) can be applied in determination of the load shedding scheme in the electric power system. In this thesis two methods which are Analytic Hierarchy Process (AHP) and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) were introduced and applied. From this thesis, a series of analyses are conducted and the results are determined. Among these two methods which are AHP and TOPSIS, the results shown that TOPSIS is the best Multi criteria Decision Making (MCDM) for load shedding scheme in the pulp mill system. TOPSIS is the most effective solution because of the highest percentage effectiveness of load shedding between these two methods. The results of the AHP and TOPSIS analysis to the pulp mill system are very promising. 2014-01 Thesis NonPeerReviewed text en http://eprints.uthm.edu.my/1709/1/24p%20ZARINA%20IBRAHIM.pdf text en http://eprints.uthm.edu.my/1709/2/ZARINA%20IBRAHIM%20COPYRIGHT%20DECLARATION.pdf text en http://eprints.uthm.edu.my/1709/3/ZARINA%20IBRAHIM%20WATERMARK.pdf Ibrahim, Zarina (2014) A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system. Masters thesis, Universiti Tun Hussein Onn Malaysia. |
institution |
Universiti Tun Hussein Onn Malaysia |
building |
UTHM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tun Hussein Onn Malaysia |
content_source |
UTHM Institutional Repository |
url_provider |
http://eprints.uthm.edu.my/ |
language |
English English English |
topic |
TK Electrical engineering. Electronics Nuclear engineering TK1001-1841 Production of electric energy or power. Powerplants. Central stations |
spellingShingle |
TK Electrical engineering. Electronics Nuclear engineering TK1001-1841 Production of electric energy or power. Powerplants. Central stations Ibrahim, Zarina A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system |
description |
The advancement of technology had encouraged mankind to design and create useful
equipment and devices. These equipment enable users to fully utilize them in various
applications. Pulp mill is one of the heavy industries that consumes large amount of
electricity in its production. Due to this, any malfunction of the equipment might
cause mass losses to the company. In particular, the breakdown of the generator
would cause other generators to be overloaded. In the meantime, the subsequence
loads will be shed until the generators are sufficient to provide the power to other
loads. Once the fault had been fixed, the load shedding scheme can be deactivated.
Thus, load shedding scheme is the best way in handling such condition. Selected load
will be shed under this scheme in order to protect the generators from being
damaged. Multi Criteria Decision Making (MCDM) can be applied in determination
of the load shedding scheme in the electric power system. In this thesis two methods
which are Analytic Hierarchy Process (AHP) and Technique for Order Preference by
Similarity to Ideal Solution (TOPSIS) were introduced and applied. From this thesis,
a series of analyses are conducted and the results are determined. Among these two
methods which are AHP and TOPSIS, the results shown that TOPSIS is the best
Multi criteria Decision Making (MCDM) for load shedding scheme in the pulp mill
system. TOPSIS is the most effective solution because of the highest percentage
effectiveness of load shedding between these two methods. The results of the AHP
and TOPSIS analysis to the pulp mill system are very promising. |
format |
Thesis |
author |
Ibrahim, Zarina |
author_facet |
Ibrahim, Zarina |
author_sort |
Ibrahim, Zarina |
title |
A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system |
title_short |
A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system |
title_full |
A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system |
title_fullStr |
A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system |
title_full_unstemmed |
A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system |
title_sort |
comparative study of the ahp and topsis methods for implementing load shedding scheme in a pulp mill system |
publishDate |
2014 |
url |
http://eprints.uthm.edu.my/1709/1/24p%20ZARINA%20IBRAHIM.pdf http://eprints.uthm.edu.my/1709/2/ZARINA%20IBRAHIM%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/1709/3/ZARINA%20IBRAHIM%20WATERMARK.pdf http://eprints.uthm.edu.my/1709/ |
_version_ |
1738580895242125312 |