Methodology to develop bottleneck-based heuristic for permutation flow shop scheduling
This paper proposes a new heuristic that introduces the method of bottleneck-based (BNB) at the beginning of an initial sequence determination with the objective of make span minimization for large size problem. Earlier studies found that the scheduling activity become complicated when dealing with...
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Book Section |
Language: | English |
Published: |
Penerbit UTHM
2020
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/3095/1/Ch07.pdf http://eprints.uthm.edu.my/3095/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Tun Hussein Onn Malaysia |
Language: | English |
Be the first to leave a comment!