Monitoring system for transformer

The cost of a power transformer which can cost up from $2million to $4 million [1], is one of the factors that motivate electrical company to take care of its power transformer in order to run smoothly throughout its recommended life span. Currently, transformer around the world had reached an old a...

Full description

Saved in:
Bibliographic Details
Main Authors: Ahmad, Nasarudin, Wahid, Herman, Sahlan, Shafisshuaza, Md. Yunos, Yusri, Abas, Khairul Hamimah
Format: Book Section
Language:English
Published: Penerbit UTHM 2016
Subjects:
Online Access:http://eprints.uthm.edu.my/4289/1/Chapter%2011_SIS_S1.pdf
http://eprints.uthm.edu.my/4289/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Tun Hussein Onn Malaysia
Language: English
id my.uthm.eprints.4289
record_format eprints
spelling my.uthm.eprints.42892022-01-13T03:22:19Z http://eprints.uthm.edu.my/4289/ Monitoring system for transformer Ahmad, Nasarudin Wahid, Herman Sahlan, Shafisshuaza Md. Yunos, Yusri Abas, Khairul Hamimah TK7800-8360 Electronics The cost of a power transformer which can cost up from $2million to $4 million [1], is one of the factors that motivate electrical company to take care of its power transformer in order to run smoothly throughout its recommended life span. Currently, transformer around the world had reached an old age which is an average age of 30 years for industry plant and 40 years for utility use [1]. According to an international survey, failure rate is increasing proportionally with age [2]. Besides, any failure to a transformer can cost up to $15 million [1] which include buying a new transformer, environmental clean-up, add on modifications of site work and so forth. Moreover, substation where power transformer is located is usually unstaffed. As a result, performance of power transformer cannot be identified by the maintenance crew or person in charge of the company. Hence, typically, maintenance crew may take action by checking the power transformer on-site after a certain interval. Besides, maintenance of power transformer will be carry on with a simple time-based maintenance (TBM), which repairs all the available transformers after specified interval. Due to financial constraint, TBM method can no more be applied, because TBM cause a lot of unnecessary repair and waste a lot of unnecessary cost. As a result, maintenance crew starts focusing on conditional-based maintenance (CBM), which gives more focuses on critical transformer. Hence, maintenance will be according to the health condition of the power transformer [1]. With the aid of a remotely monitoring system for power transformer, maintenance crew able to monitor the status of critical transformer much convenient. Therefore, instead of doing petrol to check on unstaffed substation, maintenance crew can monitor the performance of power transformer remotely. Penerbit UTHM Ahmad, Nasarudin Wahap, Ahmad Ridwan 2016 Book Section PeerReviewed text en http://eprints.uthm.edu.my/4289/1/Chapter%2011_SIS_S1.pdf Ahmad, Nasarudin and Wahid, Herman and Sahlan, Shafisshuaza and Md. Yunos, Yusri and Abas, Khairul Hamimah (2016) Monitoring system for transformer. In: Sensor & Instrumentation System Series 1. Penerbit UTHM, Batu Pahat, Johor, pp. 54-62. ISBN 9789675457524
institution Universiti Tun Hussein Onn Malaysia
building UTHM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
url_provider http://eprints.uthm.edu.my/
language English
topic TK7800-8360 Electronics
spellingShingle TK7800-8360 Electronics
Ahmad, Nasarudin
Wahid, Herman
Sahlan, Shafisshuaza
Md. Yunos, Yusri
Abas, Khairul Hamimah
Monitoring system for transformer
description The cost of a power transformer which can cost up from $2million to $4 million [1], is one of the factors that motivate electrical company to take care of its power transformer in order to run smoothly throughout its recommended life span. Currently, transformer around the world had reached an old age which is an average age of 30 years for industry plant and 40 years for utility use [1]. According to an international survey, failure rate is increasing proportionally with age [2]. Besides, any failure to a transformer can cost up to $15 million [1] which include buying a new transformer, environmental clean-up, add on modifications of site work and so forth. Moreover, substation where power transformer is located is usually unstaffed. As a result, performance of power transformer cannot be identified by the maintenance crew or person in charge of the company. Hence, typically, maintenance crew may take action by checking the power transformer on-site after a certain interval. Besides, maintenance of power transformer will be carry on with a simple time-based maintenance (TBM), which repairs all the available transformers after specified interval. Due to financial constraint, TBM method can no more be applied, because TBM cause a lot of unnecessary repair and waste a lot of unnecessary cost. As a result, maintenance crew starts focusing on conditional-based maintenance (CBM), which gives more focuses on critical transformer. Hence, maintenance will be according to the health condition of the power transformer [1]. With the aid of a remotely monitoring system for power transformer, maintenance crew able to monitor the status of critical transformer much convenient. Therefore, instead of doing petrol to check on unstaffed substation, maintenance crew can monitor the performance of power transformer remotely.
author2 Ahmad, Nasarudin
author_facet Ahmad, Nasarudin
Ahmad, Nasarudin
Wahid, Herman
Sahlan, Shafisshuaza
Md. Yunos, Yusri
Abas, Khairul Hamimah
format Book Section
author Ahmad, Nasarudin
Wahid, Herman
Sahlan, Shafisshuaza
Md. Yunos, Yusri
Abas, Khairul Hamimah
author_sort Ahmad, Nasarudin
title Monitoring system for transformer
title_short Monitoring system for transformer
title_full Monitoring system for transformer
title_fullStr Monitoring system for transformer
title_full_unstemmed Monitoring system for transformer
title_sort monitoring system for transformer
publisher Penerbit UTHM
publishDate 2016
url http://eprints.uthm.edu.my/4289/1/Chapter%2011_SIS_S1.pdf
http://eprints.uthm.edu.my/4289/
_version_ 1738581231974481920