Construction industry has become one of the greatest income provider as it has contributed to the Gross Domestic Product (GDP) for Malaysia. However, construction sector has been much affected by unexpected situation such as construction delays. Delays in construction industry is one of the common p...

Full description

Saved in:
Bibliographic Details
Main Authors: Hasmori, Muhammad Fikri, Said, Ilias, Deraman, Rafikullah, Abas, Nor Haslinda, Nagapan, Sasitharan, Ismail, Mohd Hanif, Khalid, Faisal Sheikh, Roslan, Ahmad Farhan
Format: Article
Language:English
Published: Penerbit UTHM 2018
Subjects:
Online Access:http://eprints.uthm.edu.my/4311/1/AJ%202018%20%2869%29.pdf
http://eprints.uthm.edu.my/4311/
https://doi.org/10.30880/ijie.2018.10.02.007
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Tun Hussein Onn Malaysia
Language: English
id my.uthm.eprints.4311
record_format eprints
spelling my.uthm.eprints.43112021-12-02T03:09:17Z http://eprints.uthm.edu.my/4311/ Significant factors of construction delays among contractors in Klang Valley and its mitigation Hasmori, Muhammad Fikri Said, Ilias Deraman, Rafikullah Abas, Nor Haslinda Nagapan, Sasitharan Ismail, Mohd Hanif Khalid, Faisal Sheikh Roslan, Ahmad Farhan T Technology (General) TH Building construction TH5011-5701 Construction by phase of the work (Building trades) Construction industry has become one of the greatest income provider as it has contributed to the Gross Domestic Product (GDP) for Malaysia. However, construction sector has been much affected by unexpected situation such as construction delays. Delays in construction industry is one of the common problems that happened to most construction projects. By considering all viewpoint from various parties that involves in construction process such as contractors, client, consultant and others, this research identified the major factor that contributes to delays in Klang Valley, Malaysia. Questionnaires were distributed among respondents that involved in construction project in Klang Valley. The process of data analysis was conducted by using descriptive statistic that ranked the mean value of factors that contributes to delays. By using the ranking method, financial difficulties were recognized as the most significant factor that caused delays. Thus, by using the same method, some mitigation action has been proposed in order to avoid time overrun in construction. Penerbit UTHM 2018 Article PeerReviewed text en http://eprints.uthm.edu.my/4311/1/AJ%202018%20%2869%29.pdf Hasmori, Muhammad Fikri and Said, Ilias and Deraman, Rafikullah and Abas, Nor Haslinda and Nagapan, Sasitharan and Ismail, Mohd Hanif and Khalid, Faisal Sheikh and Roslan, Ahmad Farhan (2018) Significant factors of construction delays among contractors in Klang Valley and its mitigation. International Journal of Integrated Engineering, 10 (2). pp. 32-36. ISSN 2229-838X https://doi.org/10.30880/ijie.2018.10.02.007
institution Universiti Tun Hussein Onn Malaysia
building UTHM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
url_provider http://eprints.uthm.edu.my/
language English
topic T Technology (General)
TH Building construction
TH5011-5701 Construction by phase of the work (Building trades)
spellingShingle T Technology (General)
TH Building construction
TH5011-5701 Construction by phase of the work (Building trades)
Hasmori, Muhammad Fikri
Said, Ilias
Deraman, Rafikullah
Abas, Nor Haslinda
Nagapan, Sasitharan
Ismail, Mohd Hanif
Khalid, Faisal Sheikh
Roslan, Ahmad Farhan
Significant factors of construction delays among contractors in Klang Valley and its mitigation
description Construction industry has become one of the greatest income provider as it has contributed to the Gross Domestic Product (GDP) for Malaysia. However, construction sector has been much affected by unexpected situation such as construction delays. Delays in construction industry is one of the common problems that happened to most construction projects. By considering all viewpoint from various parties that involves in construction process such as contractors, client, consultant and others, this research identified the major factor that contributes to delays in Klang Valley, Malaysia. Questionnaires were distributed among respondents that involved in construction project in Klang Valley. The process of data analysis was conducted by using descriptive statistic that ranked the mean value of factors that contributes to delays. By using the ranking method, financial difficulties were recognized as the most significant factor that caused delays. Thus, by using the same method, some mitigation action has been proposed in order to avoid time overrun in construction.
format Article
author Hasmori, Muhammad Fikri
Said, Ilias
Deraman, Rafikullah
Abas, Nor Haslinda
Nagapan, Sasitharan
Ismail, Mohd Hanif
Khalid, Faisal Sheikh
Roslan, Ahmad Farhan
author_facet Hasmori, Muhammad Fikri
Said, Ilias
Deraman, Rafikullah
Abas, Nor Haslinda
Nagapan, Sasitharan
Ismail, Mohd Hanif
Khalid, Faisal Sheikh
Roslan, Ahmad Farhan
author_sort Hasmori, Muhammad Fikri
title Significant factors of construction delays among contractors in Klang Valley and its mitigation
title_short Significant factors of construction delays among contractors in Klang Valley and its mitigation
title_full Significant factors of construction delays among contractors in Klang Valley and its mitigation
title_fullStr Significant factors of construction delays among contractors in Klang Valley and its mitigation
title_full_unstemmed Significant factors of construction delays among contractors in Klang Valley and its mitigation
title_sort significant factors of construction delays among contractors in klang valley and its mitigation
publisher Penerbit UTHM
publishDate 2018
url http://eprints.uthm.edu.my/4311/1/AJ%202018%20%2869%29.pdf
http://eprints.uthm.edu.my/4311/
https://doi.org/10.30880/ijie.2018.10.02.007
_version_ 1738581234927271936