Significant factors of construction delays among contractors in Klang Valley and its mitigation
Construction industry has become one of the greatest income provider as it has contributed to the Gross Domestic Product (GDP) for Malaysia. However, construction sector has been much affected by unexpected situation such as construction delays. Delays in construction industry is one of the common p...
Saved in:
Main Authors: | , , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit UTHM
2018
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/4311/1/AJ%202018%20%2869%29.pdf http://eprints.uthm.edu.my/4311/ https://doi.org/10.30880/ijie.2018.10.02.007 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Tun Hussein Onn Malaysia |
Language: | English |
id |
my.uthm.eprints.4311 |
---|---|
record_format |
eprints |
spelling |
my.uthm.eprints.43112021-12-02T03:09:17Z http://eprints.uthm.edu.my/4311/ Significant factors of construction delays among contractors in Klang Valley and its mitigation Hasmori, Muhammad Fikri Said, Ilias Deraman, Rafikullah Abas, Nor Haslinda Nagapan, Sasitharan Ismail, Mohd Hanif Khalid, Faisal Sheikh Roslan, Ahmad Farhan T Technology (General) TH Building construction TH5011-5701 Construction by phase of the work (Building trades) Construction industry has become one of the greatest income provider as it has contributed to the Gross Domestic Product (GDP) for Malaysia. However, construction sector has been much affected by unexpected situation such as construction delays. Delays in construction industry is one of the common problems that happened to most construction projects. By considering all viewpoint from various parties that involves in construction process such as contractors, client, consultant and others, this research identified the major factor that contributes to delays in Klang Valley, Malaysia. Questionnaires were distributed among respondents that involved in construction project in Klang Valley. The process of data analysis was conducted by using descriptive statistic that ranked the mean value of factors that contributes to delays. By using the ranking method, financial difficulties were recognized as the most significant factor that caused delays. Thus, by using the same method, some mitigation action has been proposed in order to avoid time overrun in construction. Penerbit UTHM 2018 Article PeerReviewed text en http://eprints.uthm.edu.my/4311/1/AJ%202018%20%2869%29.pdf Hasmori, Muhammad Fikri and Said, Ilias and Deraman, Rafikullah and Abas, Nor Haslinda and Nagapan, Sasitharan and Ismail, Mohd Hanif and Khalid, Faisal Sheikh and Roslan, Ahmad Farhan (2018) Significant factors of construction delays among contractors in Klang Valley and its mitigation. International Journal of Integrated Engineering, 10 (2). pp. 32-36. ISSN 2229-838X https://doi.org/10.30880/ijie.2018.10.02.007 |
institution |
Universiti Tun Hussein Onn Malaysia |
building |
UTHM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tun Hussein Onn Malaysia |
content_source |
UTHM Institutional Repository |
url_provider |
http://eprints.uthm.edu.my/ |
language |
English |
topic |
T Technology (General) TH Building construction TH5011-5701 Construction by phase of the work (Building trades) |
spellingShingle |
T Technology (General) TH Building construction TH5011-5701 Construction by phase of the work (Building trades) Hasmori, Muhammad Fikri Said, Ilias Deraman, Rafikullah Abas, Nor Haslinda Nagapan, Sasitharan Ismail, Mohd Hanif Khalid, Faisal Sheikh Roslan, Ahmad Farhan Significant factors of construction delays among contractors in Klang Valley and its mitigation |
description |
Construction industry has become one of the greatest income provider as it has contributed to the Gross Domestic Product (GDP) for Malaysia. However, construction sector has been much affected by unexpected situation such as construction delays. Delays in construction industry is one of the common problems that happened to most construction projects. By considering all viewpoint from various parties that involves in construction process such as contractors, client, consultant and others, this research identified the major factor that contributes to delays in Klang Valley, Malaysia. Questionnaires were distributed among respondents that involved in construction project in Klang Valley. The process of data analysis was conducted by using descriptive statistic that ranked the mean value of factors that contributes to delays. By using the ranking method, financial difficulties were recognized as the most significant factor that caused delays. Thus, by using the same method, some mitigation action has been proposed in order to avoid time overrun in construction. |
format |
Article |
author |
Hasmori, Muhammad Fikri Said, Ilias Deraman, Rafikullah Abas, Nor Haslinda Nagapan, Sasitharan Ismail, Mohd Hanif Khalid, Faisal Sheikh Roslan, Ahmad Farhan |
author_facet |
Hasmori, Muhammad Fikri Said, Ilias Deraman, Rafikullah Abas, Nor Haslinda Nagapan, Sasitharan Ismail, Mohd Hanif Khalid, Faisal Sheikh Roslan, Ahmad Farhan |
author_sort |
Hasmori, Muhammad Fikri |
title |
Significant factors of construction delays among contractors in Klang Valley and its mitigation |
title_short |
Significant factors of construction delays among contractors in Klang Valley and its mitigation |
title_full |
Significant factors of construction delays among contractors in Klang Valley and its mitigation |
title_fullStr |
Significant factors of construction delays among contractors in Klang Valley and its mitigation |
title_full_unstemmed |
Significant factors of construction delays among contractors in Klang Valley and its mitigation |
title_sort |
significant factors of construction delays among contractors in klang valley and its mitigation |
publisher |
Penerbit UTHM |
publishDate |
2018 |
url |
http://eprints.uthm.edu.my/4311/1/AJ%202018%20%2869%29.pdf http://eprints.uthm.edu.my/4311/ https://doi.org/10.30880/ijie.2018.10.02.007 |
_version_ |
1738581234927271936 |