Bim: the setback or solution to project cost issues in Malaysia construction industry?

Malaysia is progressing into Industry Revolution (IR) 4.0 which emphasizes more onto digital, data and artificial intelligence where everything is expected to be automated. However, cost tends to be a major issue at the pioneer stage of embracing technology where Building Information Modelling (B...

Full description

Saved in:
Bibliographic Details
Main Authors: Ang, P S E, Pung, Y L, Tsai, K L, Zulkaply, M NA, Tey, J S, Kasim, N B, Osman, M H, Musa, M K, Abdul Rahman, M A
Format: Conference or Workshop Item
Language:English
Published: 2020
Subjects:
Online Access:http://eprints.uthm.edu.my/4684/1/KP%202020%20%2897%29.pdf
http://eprints.uthm.edu.my/4684/
http://doi:10.1088/1755-1315/476/1/012011
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Tun Hussein Onn Malaysia
Language: English
id my.uthm.eprints.4684
record_format eprints
spelling my.uthm.eprints.46842022-01-24T02:47:46Z http://eprints.uthm.edu.my/4684/ Bim: the setback or solution to project cost issues in Malaysia construction industry? Ang, P S E Pung, Y L Tsai, K L Zulkaply, M NA Tey, J S Kasim, N B Osman, M H Musa, M K Abdul Rahman, M A T Technology (General) TH5011-5701 Construction by phase of the work (Building trades) Malaysia is progressing into Industry Revolution (IR) 4.0 which emphasizes more onto digital, data and artificial intelligence where everything is expected to be automated. However, cost tends to be a major issue at the pioneer stage of embracing technology where Building Information Modelling (BIM) for example tends to be a cost tussle for the current construction industry. Yet, research has shown that BIM is arguably one of the technology platforms in combating the costing issue considering that BIM enables 3D model elements to link to cost and auto-generate quantities which potentially achieve cost-effective project. Due to the conflicting perspectives of how BIM affects project cost issues, it is imperative to investigate the cost-related issues in implementing BIM in the project and to determine how BIM in general positively influences the overall project cost. Qualitative research is adopted in this study. A semi-structured interview was conducted among four professionals who employs BIM in their project. They consist of the assistant manager, senior manager and chief executive officer. The data collected is analysed by utilising Matrix Table for better organisation. The scope of the study is in the Selangor state in which the local construction industry had applied BIM in their construction industry up to the 3D stage. The results showed that the BIM implementation cost is not too burdensome as it is only a one-time cost and does not vary throughout the project period. In addition, the BIM influence on the overall cost of the project is beneficial to the industry. It improves workflow and cost management. In conclusion, BIM is beneficial to the construction industry in the long term. It is important to resolve the costrelated issues for implement BIM and hence, encourage the usage of BIM, especially in the IR 4.0 ecosystem 2020 Conference or Workshop Item PeerReviewed text en http://eprints.uthm.edu.my/4684/1/KP%202020%20%2897%29.pdf Ang, P S E and Pung, Y L and Tsai, K L and Zulkaply, M NA and Tey, J S and Kasim, N B and Osman, M H and Musa, M K and Abdul Rahman, M A (2020) Bim: the setback or solution to project cost issues in Malaysia construction industry? In: 2nd International Conference on Civil & Environmental Engineering. http://doi:10.1088/1755-1315/476/1/012011
institution Universiti Tun Hussein Onn Malaysia
building UTHM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
url_provider http://eprints.uthm.edu.my/
language English
topic T Technology (General)
TH5011-5701 Construction by phase of the work (Building trades)
spellingShingle T Technology (General)
TH5011-5701 Construction by phase of the work (Building trades)
Ang, P S E
Pung, Y L
Tsai, K L
Zulkaply, M NA
Tey, J S
Kasim, N B
Osman, M H
Musa, M K
Abdul Rahman, M A
Bim: the setback or solution to project cost issues in Malaysia construction industry?
description Malaysia is progressing into Industry Revolution (IR) 4.0 which emphasizes more onto digital, data and artificial intelligence where everything is expected to be automated. However, cost tends to be a major issue at the pioneer stage of embracing technology where Building Information Modelling (BIM) for example tends to be a cost tussle for the current construction industry. Yet, research has shown that BIM is arguably one of the technology platforms in combating the costing issue considering that BIM enables 3D model elements to link to cost and auto-generate quantities which potentially achieve cost-effective project. Due to the conflicting perspectives of how BIM affects project cost issues, it is imperative to investigate the cost-related issues in implementing BIM in the project and to determine how BIM in general positively influences the overall project cost. Qualitative research is adopted in this study. A semi-structured interview was conducted among four professionals who employs BIM in their project. They consist of the assistant manager, senior manager and chief executive officer. The data collected is analysed by utilising Matrix Table for better organisation. The scope of the study is in the Selangor state in which the local construction industry had applied BIM in their construction industry up to the 3D stage. The results showed that the BIM implementation cost is not too burdensome as it is only a one-time cost and does not vary throughout the project period. In addition, the BIM influence on the overall cost of the project is beneficial to the industry. It improves workflow and cost management. In conclusion, BIM is beneficial to the construction industry in the long term. It is important to resolve the costrelated issues for implement BIM and hence, encourage the usage of BIM, especially in the IR 4.0 ecosystem
format Conference or Workshop Item
author Ang, P S E
Pung, Y L
Tsai, K L
Zulkaply, M NA
Tey, J S
Kasim, N B
Osman, M H
Musa, M K
Abdul Rahman, M A
author_facet Ang, P S E
Pung, Y L
Tsai, K L
Zulkaply, M NA
Tey, J S
Kasim, N B
Osman, M H
Musa, M K
Abdul Rahman, M A
author_sort Ang, P S E
title Bim: the setback or solution to project cost issues in Malaysia construction industry?
title_short Bim: the setback or solution to project cost issues in Malaysia construction industry?
title_full Bim: the setback or solution to project cost issues in Malaysia construction industry?
title_fullStr Bim: the setback or solution to project cost issues in Malaysia construction industry?
title_full_unstemmed Bim: the setback or solution to project cost issues in Malaysia construction industry?
title_sort bim: the setback or solution to project cost issues in malaysia construction industry?
publishDate 2020
url http://eprints.uthm.edu.my/4684/1/KP%202020%20%2897%29.pdf
http://eprints.uthm.edu.my/4684/
http://doi:10.1088/1755-1315/476/1/012011
_version_ 1738581285086953472