Measures for mitigating the delay in high-rise building construction projects in Dubai
Construction industry faces several challenges such as low labour productivity, cost overrun, time overrun, and extreme weather condition. Globally, the most severe challenge is project delay, particularly in Dubai where the construction industry is booming rapidly than other parts of the world, esp...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English English English |
Published: |
2019
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/519/1/24p%20IMTIAZ%20ALI%20BHATTI.pdf http://eprints.uthm.edu.my/519/2/IMTIAZ%20ALI%20BHATTI%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/519/3/IMTIAZ%20ALI%20BHATTI%20WATERMARK.pdf http://eprints.uthm.edu.my/519/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Tun Hussein Onn Malaysia |
Language: | English English English |