Investigate how construction waste generation rate is, different for every types of project in peninsular Malaysia, using site visit method

Malaysia is a rapid development of its urban centre, and where construction and demolition (C&D) waste generation is increasing proportionally with the new construction industry development. In Malaysia, the most crucial issue highlighted by local researchers is excessive of C&D waste genera...

Full description

Saved in:
Bibliographic Details
Main Authors: Subramaniam, Shivaraj, Abdullah, Abd Halid, Nagapan, Sasitharan, Kupusamy, Kumanan, Manian, Haritharan, Daud, Zawawi
Format: Article
Language:English
Published: Penerbit UTHM 2018
Subjects:
Online Access:http://eprints.uthm.edu.my/5460/1/AJ%202018%20%28194%29.pdf
http://eprints.uthm.edu.my/5460/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Tun Hussein Onn Malaysia
Language: English
Be the first to leave a comment!
You must be logged in first