Study of factors influencing construction delays at rural area in Malaysia
Construction is one of an important industry which contributes to the economic growth in Malaysia. However, it has been revealed that 79.5 percent and 66.7 percent of the public and private projects were not completed within the time specified in the contracts out of 359 projects in Malaysia. Theref...
Saved in:
Main Authors: | , , , , , , , |
---|---|
Format: | Article |
Published: |
INSTITUTE OF PHYSICS PUBLISHING
2018
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/6854/ https://doi.org/10.1088/1742-6596/1049/1/012017 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Tun Hussein Onn Malaysia |