Bottleneck-based heuristic for permutation flowshop scheduling

The newly heuristic is developed by introducing the bottleneck-based concept that was applied at the beginning of initial solution determination. The heuristic is known as Bottleneck-Based (BNB) heuristic. The previous study found that the scheduling activity become complex when dealing with large n...

Full description

Saved in:
Bibliographic Details
Main Author: Isa, Noor Amira
Format: Thesis
Language:English
English
English
Published: 2017
Subjects:
Online Access:http://eprints.uthm.edu.my/837/1/24p%20NOOR%20AMIRA%20ISA.pdf
http://eprints.uthm.edu.my/837/2/NOOR%20AMIRA%20ISA%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/837/3/NOOR%20AMIRA%20ISA%20WATERMARK.pdf
http://eprints.uthm.edu.my/837/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Tun Hussein Onn Malaysia
Language: English
English
English

Similar Items