Critical risk factor affecting cost overrun in highway project of West Sumatera

One part of the form of public capital that is collected into investments made by the government is infrastructure. Several types of infrastructure are roads, bridges, irrigation, and others to support economic activities. It can be seen that there is still a slowdown in the implementation of infras...

Full description

Saved in:
Bibliographic Details
Main Authors: Kurniawan, Deddy, Mairizal, Mairizal, Masril, Masril, Mohd. Sam, Abd. Rahman, Abd. Majid, Mohd. Zaimi
Format: Conference or Workshop Item
Language:English
Published: 2022
Subjects:
Online Access:http://eprints.utm.my/103704/1/AbdulRahmanMohdSam2022_CriticalRiskFactorAffectingCostOverrun.pdf
http://eprints.utm.my/103704/
http://dx.doi.org/10.1088/1755-1315/1022/1/012013
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English
id my.utm.103704
record_format eprints
spelling my.utm.1037042023-11-23T08:36:08Z http://eprints.utm.my/103704/ Critical risk factor affecting cost overrun in highway project of West Sumatera Kurniawan, Deddy Mairizal, Mairizal Masril, Masril Mohd. Sam, Abd. Rahman Abd. Majid, Mohd. Zaimi TA Engineering (General). Civil engineering (General) One part of the form of public capital that is collected into investments made by the government is infrastructure. Several types of infrastructure are roads, bridges, irrigation, and others to support economic activities. It can be seen that there is still a slowdown in the implementation of infrastructure development in Indonesia, which is marked by the lack of quality and quantity of infrastructure. Infrastructure work is part of the responsibilities of the construction industry players, which are very dynamic with various threats to be faced. In practice, every construction project contains risks, unless the owner can transfer it to another party. This study aims to identify critical risks that occur in infrastructure development projects, especially roads in West Sumatra which have an impact on cost overruns in their implementation. This research uses literature study, data collection, and questionnaires which are analyzed using quantitative statistical analysis. The findings in this study are the cost overrun factors that occur in the implementation of road projects in West Sumatra which consist of 12 (twelve) critical risk factors. The highest of the twelve delay factors is the lack of experience of contractors who cannot manage a project properly. 2022 Conference or Workshop Item PeerReviewed application/pdf en http://eprints.utm.my/103704/1/AbdulRahmanMohdSam2022_CriticalRiskFactorAffectingCostOverrun.pdf Kurniawan, Deddy and Mairizal, Mairizal and Masril, Masril and Mohd. Sam, Abd. Rahman and Abd. Majid, Mohd. Zaimi (2022) Critical risk factor affecting cost overrun in highway project of West Sumatera. In: 6th International Conference on Civil and Environmental Engineering for Sustainability (IConCEES 2021), 15 November 2021 - 16 November 2021, Virtual, Online. http://dx.doi.org/10.1088/1755-1315/1022/1/012013
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Kurniawan, Deddy
Mairizal, Mairizal
Masril, Masril
Mohd. Sam, Abd. Rahman
Abd. Majid, Mohd. Zaimi
Critical risk factor affecting cost overrun in highway project of West Sumatera
description One part of the form of public capital that is collected into investments made by the government is infrastructure. Several types of infrastructure are roads, bridges, irrigation, and others to support economic activities. It can be seen that there is still a slowdown in the implementation of infrastructure development in Indonesia, which is marked by the lack of quality and quantity of infrastructure. Infrastructure work is part of the responsibilities of the construction industry players, which are very dynamic with various threats to be faced. In practice, every construction project contains risks, unless the owner can transfer it to another party. This study aims to identify critical risks that occur in infrastructure development projects, especially roads in West Sumatra which have an impact on cost overruns in their implementation. This research uses literature study, data collection, and questionnaires which are analyzed using quantitative statistical analysis. The findings in this study are the cost overrun factors that occur in the implementation of road projects in West Sumatra which consist of 12 (twelve) critical risk factors. The highest of the twelve delay factors is the lack of experience of contractors who cannot manage a project properly.
format Conference or Workshop Item
author Kurniawan, Deddy
Mairizal, Mairizal
Masril, Masril
Mohd. Sam, Abd. Rahman
Abd. Majid, Mohd. Zaimi
author_facet Kurniawan, Deddy
Mairizal, Mairizal
Masril, Masril
Mohd. Sam, Abd. Rahman
Abd. Majid, Mohd. Zaimi
author_sort Kurniawan, Deddy
title Critical risk factor affecting cost overrun in highway project of West Sumatera
title_short Critical risk factor affecting cost overrun in highway project of West Sumatera
title_full Critical risk factor affecting cost overrun in highway project of West Sumatera
title_fullStr Critical risk factor affecting cost overrun in highway project of West Sumatera
title_full_unstemmed Critical risk factor affecting cost overrun in highway project of West Sumatera
title_sort critical risk factor affecting cost overrun in highway project of west sumatera
publishDate 2022
url http://eprints.utm.my/103704/1/AbdulRahmanMohdSam2022_CriticalRiskFactorAffectingCostOverrun.pdf
http://eprints.utm.my/103704/
http://dx.doi.org/10.1088/1755-1315/1022/1/012013
_version_ 1783876403598458880