Mahalanobis-Taguchi system and time-driven activity-based costing integration of printed circuit board
System integration involves creating or implementing a customized architecture, as well as integrating hardware, packaged and customized software, and communications. The electronic component demand is rising nowadays. However, a weekly rejection report for rejected parts is necessary in reflect the...
Saved in:
Main Authors: | , , , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Little Lion Scientific
2023
|
Subjects: | |
Online Access: | http://eprints.utm.my/104843/1/FaizirRamlie2023_MahalanobisTaguchiSystemandTimeDriven.pdf http://eprints.utm.my/104843/ http://www.jatit.org/volumes/hundredone24.php |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
Language: | English |
id |
my.utm.104843 |
---|---|
record_format |
eprints |
spelling |
my.utm.1048432024-03-25T08:57:57Z http://eprints.utm.my/104843/ Mahalanobis-Taguchi system and time-driven activity-based costing integration of printed circuit board Aris, Nurul Haziyani Abu, Mohd. Yazid Mohd. Zaini, Sri Nur Areena Mohd. Jamil, Muhammad Arieffudin Pinueh, Nur Syafikah Wan Muhammad, Wan Zuki Azman Ramlie, Faizir Harudin, Nolia Emelia Sari, Emelia Sari TJ Mechanical engineering and machinery System integration involves creating or implementing a customized architecture, as well as integrating hardware, packaged and customized software, and communications. The electronic component demand is rising nowadays. However, a weekly rejection report for rejected parts is necessary in reflect the severity level as it can influence the criteria used to identify relevant parameters. Meanwhile, activity-based costing (ABC) is outdated since it employs interviews or surveys to get numerical data, which can lead to erroneous corporate data. This research aim is to integrate Mahalanobis-Taguchi system (MTS) with time-driven activity-based costing (TDABC) at the electronic component workstation. MTS optimizes 22 printed circuit board (PCB) assembly top side workstation environments. After generating time equation and capacity cost rate, TDABC considers critical elements to identify underutilized capacity. As a result, October and December have the most significant parameters (16) and August the fewest (10). Next, the TDABC confirmed that the PCB input into auto loader machine sub-activity has a large unused capacity of time (239,550 minutes) and cost (MYR18,120.67), which allows this workstation to minimize unused capacity by shifting employees to another load workstation. In spite of to minimize capacity utilization in sub-activity solder paste preparation, extra labor should be given since it has an overutilized capacity of time (- 790,100 minutes) and cost (MYR-1,000,535.13). Lastly, the reduction of waste and better forecasting is obtained after MTS and TDABC integration is implemented. Little Lion Scientific 2023-12-31 Article PeerReviewed application/pdf en http://eprints.utm.my/104843/1/FaizirRamlie2023_MahalanobisTaguchiSystemandTimeDriven.pdf Aris, Nurul Haziyani and Abu, Mohd. Yazid and Mohd. Zaini, Sri Nur Areena and Mohd. Jamil, Muhammad Arieffudin and Pinueh, Nur Syafikah and Wan Muhammad, Wan Zuki Azman and Ramlie, Faizir and Harudin, Nolia and Emelia Sari, Emelia Sari (2023) Mahalanobis-Taguchi system and time-driven activity-based costing integration of printed circuit board. Journal of Theoretical and Applied Information Technology, 101 (24). pp. 8247-8261. ISSN 1992-8645 http://www.jatit.org/volumes/hundredone24.php NA |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
language |
English |
topic |
TJ Mechanical engineering and machinery |
spellingShingle |
TJ Mechanical engineering and machinery Aris, Nurul Haziyani Abu, Mohd. Yazid Mohd. Zaini, Sri Nur Areena Mohd. Jamil, Muhammad Arieffudin Pinueh, Nur Syafikah Wan Muhammad, Wan Zuki Azman Ramlie, Faizir Harudin, Nolia Emelia Sari, Emelia Sari Mahalanobis-Taguchi system and time-driven activity-based costing integration of printed circuit board |
description |
System integration involves creating or implementing a customized architecture, as well as integrating hardware, packaged and customized software, and communications. The electronic component demand is rising nowadays. However, a weekly rejection report for rejected parts is necessary in reflect the severity level as it can influence the criteria used to identify relevant parameters. Meanwhile, activity-based costing (ABC) is outdated since it employs interviews or surveys to get numerical data, which can lead to erroneous corporate data. This research aim is to integrate Mahalanobis-Taguchi system (MTS) with time-driven activity-based costing (TDABC) at the electronic component workstation. MTS optimizes 22 printed circuit board (PCB) assembly top side workstation environments. After generating time equation and capacity cost rate, TDABC considers critical elements to identify underutilized capacity. As a result, October and December have the most significant parameters (16) and August the fewest (10). Next, the TDABC confirmed that the PCB input into auto loader machine sub-activity has a large unused capacity of time (239,550 minutes) and cost (MYR18,120.67), which allows this workstation to minimize unused capacity by shifting employees to another load workstation. In spite of to minimize capacity utilization in sub-activity solder paste preparation, extra labor should be given since it has an overutilized capacity of time (- 790,100 minutes) and cost (MYR-1,000,535.13). Lastly, the reduction of waste and better forecasting is obtained after MTS and TDABC integration is implemented. |
format |
Article |
author |
Aris, Nurul Haziyani Abu, Mohd. Yazid Mohd. Zaini, Sri Nur Areena Mohd. Jamil, Muhammad Arieffudin Pinueh, Nur Syafikah Wan Muhammad, Wan Zuki Azman Ramlie, Faizir Harudin, Nolia Emelia Sari, Emelia Sari |
author_facet |
Aris, Nurul Haziyani Abu, Mohd. Yazid Mohd. Zaini, Sri Nur Areena Mohd. Jamil, Muhammad Arieffudin Pinueh, Nur Syafikah Wan Muhammad, Wan Zuki Azman Ramlie, Faizir Harudin, Nolia Emelia Sari, Emelia Sari |
author_sort |
Aris, Nurul Haziyani |
title |
Mahalanobis-Taguchi system and time-driven activity-based costing integration of printed circuit board |
title_short |
Mahalanobis-Taguchi system and time-driven activity-based costing integration of printed circuit board |
title_full |
Mahalanobis-Taguchi system and time-driven activity-based costing integration of printed circuit board |
title_fullStr |
Mahalanobis-Taguchi system and time-driven activity-based costing integration of printed circuit board |
title_full_unstemmed |
Mahalanobis-Taguchi system and time-driven activity-based costing integration of printed circuit board |
title_sort |
mahalanobis-taguchi system and time-driven activity-based costing integration of printed circuit board |
publisher |
Little Lion Scientific |
publishDate |
2023 |
url |
http://eprints.utm.my/104843/1/FaizirRamlie2023_MahalanobisTaguchiSystemandTimeDriven.pdf http://eprints.utm.my/104843/ http://www.jatit.org/volumes/hundredone24.php |
_version_ |
1794545935629418496 |