Mahalanobis-Taguchi system and time-driven activity-based costing integration of printed circuit board

System integration involves creating or implementing a customized architecture, as well as integrating hardware, packaged and customized software, and communications. The electronic component demand is rising nowadays. However, a weekly rejection report for rejected parts is necessary in reflect the...

Full description

Saved in:
Bibliographic Details
Main Authors: Aris, Nurul Haziyani, Abu, Mohd. Yazid, Mohd. Zaini, Sri Nur Areena, Mohd. Jamil, Muhammad Arieffudin, Pinueh, Nur Syafikah, Wan Muhammad, Wan Zuki Azman, Ramlie, Faizir, Harudin, Nolia, Emelia Sari, Emelia Sari
Format: Article
Language:English
Published: Little Lion Scientific 2023
Subjects:
Online Access:http://eprints.utm.my/104843/1/FaizirRamlie2023_MahalanobisTaguchiSystemandTimeDriven.pdf
http://eprints.utm.my/104843/
http://www.jatit.org/volumes/hundredone24.php
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English
id my.utm.104843
record_format eprints
spelling my.utm.1048432024-03-25T08:57:57Z http://eprints.utm.my/104843/ Mahalanobis-Taguchi system and time-driven activity-based costing integration of printed circuit board Aris, Nurul Haziyani Abu, Mohd. Yazid Mohd. Zaini, Sri Nur Areena Mohd. Jamil, Muhammad Arieffudin Pinueh, Nur Syafikah Wan Muhammad, Wan Zuki Azman Ramlie, Faizir Harudin, Nolia Emelia Sari, Emelia Sari TJ Mechanical engineering and machinery System integration involves creating or implementing a customized architecture, as well as integrating hardware, packaged and customized software, and communications. The electronic component demand is rising nowadays. However, a weekly rejection report for rejected parts is necessary in reflect the severity level as it can influence the criteria used to identify relevant parameters. Meanwhile, activity-based costing (ABC) is outdated since it employs interviews or surveys to get numerical data, which can lead to erroneous corporate data. This research aim is to integrate Mahalanobis-Taguchi system (MTS) with time-driven activity-based costing (TDABC) at the electronic component workstation. MTS optimizes 22 printed circuit board (PCB) assembly top side workstation environments. After generating time equation and capacity cost rate, TDABC considers critical elements to identify underutilized capacity. As a result, October and December have the most significant parameters (16) and August the fewest (10). Next, the TDABC confirmed that the PCB input into auto loader machine sub-activity has a large unused capacity of time (239,550 minutes) and cost (MYR18,120.67), which allows this workstation to minimize unused capacity by shifting employees to another load workstation. In spite of to minimize capacity utilization in sub-activity solder paste preparation, extra labor should be given since it has an overutilized capacity of time (- 790,100 minutes) and cost (MYR-1,000,535.13). Lastly, the reduction of waste and better forecasting is obtained after MTS and TDABC integration is implemented. Little Lion Scientific 2023-12-31 Article PeerReviewed application/pdf en http://eprints.utm.my/104843/1/FaizirRamlie2023_MahalanobisTaguchiSystemandTimeDriven.pdf Aris, Nurul Haziyani and Abu, Mohd. Yazid and Mohd. Zaini, Sri Nur Areena and Mohd. Jamil, Muhammad Arieffudin and Pinueh, Nur Syafikah and Wan Muhammad, Wan Zuki Azman and Ramlie, Faizir and Harudin, Nolia and Emelia Sari, Emelia Sari (2023) Mahalanobis-Taguchi system and time-driven activity-based costing integration of printed circuit board. Journal of Theoretical and Applied Information Technology, 101 (24). pp. 8247-8261. ISSN 1992-8645 http://www.jatit.org/volumes/hundredone24.php NA
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TJ Mechanical engineering and machinery
spellingShingle TJ Mechanical engineering and machinery
Aris, Nurul Haziyani
Abu, Mohd. Yazid
Mohd. Zaini, Sri Nur Areena
Mohd. Jamil, Muhammad Arieffudin
Pinueh, Nur Syafikah
Wan Muhammad, Wan Zuki Azman
Ramlie, Faizir
Harudin, Nolia
Emelia Sari, Emelia Sari
Mahalanobis-Taguchi system and time-driven activity-based costing integration of printed circuit board
description System integration involves creating or implementing a customized architecture, as well as integrating hardware, packaged and customized software, and communications. The electronic component demand is rising nowadays. However, a weekly rejection report for rejected parts is necessary in reflect the severity level as it can influence the criteria used to identify relevant parameters. Meanwhile, activity-based costing (ABC) is outdated since it employs interviews or surveys to get numerical data, which can lead to erroneous corporate data. This research aim is to integrate Mahalanobis-Taguchi system (MTS) with time-driven activity-based costing (TDABC) at the electronic component workstation. MTS optimizes 22 printed circuit board (PCB) assembly top side workstation environments. After generating time equation and capacity cost rate, TDABC considers critical elements to identify underutilized capacity. As a result, October and December have the most significant parameters (16) and August the fewest (10). Next, the TDABC confirmed that the PCB input into auto loader machine sub-activity has a large unused capacity of time (239,550 minutes) and cost (MYR18,120.67), which allows this workstation to minimize unused capacity by shifting employees to another load workstation. In spite of to minimize capacity utilization in sub-activity solder paste preparation, extra labor should be given since it has an overutilized capacity of time (- 790,100 minutes) and cost (MYR-1,000,535.13). Lastly, the reduction of waste and better forecasting is obtained after MTS and TDABC integration is implemented.
format Article
author Aris, Nurul Haziyani
Abu, Mohd. Yazid
Mohd. Zaini, Sri Nur Areena
Mohd. Jamil, Muhammad Arieffudin
Pinueh, Nur Syafikah
Wan Muhammad, Wan Zuki Azman
Ramlie, Faizir
Harudin, Nolia
Emelia Sari, Emelia Sari
author_facet Aris, Nurul Haziyani
Abu, Mohd. Yazid
Mohd. Zaini, Sri Nur Areena
Mohd. Jamil, Muhammad Arieffudin
Pinueh, Nur Syafikah
Wan Muhammad, Wan Zuki Azman
Ramlie, Faizir
Harudin, Nolia
Emelia Sari, Emelia Sari
author_sort Aris, Nurul Haziyani
title Mahalanobis-Taguchi system and time-driven activity-based costing integration of printed circuit board
title_short Mahalanobis-Taguchi system and time-driven activity-based costing integration of printed circuit board
title_full Mahalanobis-Taguchi system and time-driven activity-based costing integration of printed circuit board
title_fullStr Mahalanobis-Taguchi system and time-driven activity-based costing integration of printed circuit board
title_full_unstemmed Mahalanobis-Taguchi system and time-driven activity-based costing integration of printed circuit board
title_sort mahalanobis-taguchi system and time-driven activity-based costing integration of printed circuit board
publisher Little Lion Scientific
publishDate 2023
url http://eprints.utm.my/104843/1/FaizirRamlie2023_MahalanobisTaguchiSystemandTimeDriven.pdf
http://eprints.utm.my/104843/
http://www.jatit.org/volumes/hundredone24.php
_version_ 1794545935629418496