Factors affecting the contractor’s mark-up size decision in Malaysia
Construction industry is a competitive industry and the only possible way for a contractor to survive is by winning the tenders and making profit. Therefore, a “right” mark-up size is essential for contractor which to maximum possible profit, at the same time keeping its bid at a competitive level....
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/11137/1/TeyKimHaiMFKA2009.pdf http://eprints.utm.my/id/eprint/11137/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
Language: | English |