Vendor Involvement and Concurrent Engineering: Methods in Reducing Development Time For New Model in Automotive Industry
A study of method improvement to reduce development time for new model in automotive industry is presented in this paper. The approach taken is by studying the existing practice in car development. It was found that in the current practice of car development, project planning and master schedule wer...
Saved in:
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universiti Teknologi Malaysia
2005
|
Online Access: | http://eprints.utm.my/id/eprint/1122/1/AbuBakarAbdulHamid2005_%20VendorInvolvementandConcurrentEngineeringMethods.pdf http://eprints.utm.my/id/eprint/1122/ http://www.jurnal-kemanusiaan.utm.my/index.php/kemanusiaan/article/view/134 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
Language: | English |
id |
my.utm.1122 |
---|---|
record_format |
eprints |
spelling |
my.utm.11222017-10-05T03:40:41Z http://eprints.utm.my/id/eprint/1122/ Vendor Involvement and Concurrent Engineering: Methods in Reducing Development Time For New Model in Automotive Industry Nik Mohamed, Nik Mohd. Zuki Sastra, Hasan Yudie Salit, Mohd. Sapuan Ismail, Napsiah Raj Arora, Prithivi Abdul Hamid, Abu Bakar A study of method improvement to reduce development time for new model in automotive industry is presented in this paper. The approach taken is by studying the existing practice in car development. It was found that in the current practice of car development, project planning and master schedule were not officially endorsed by all related departmental heads, which resulted in too ambitious and unrealistic schedules. Other problem includes lack of comprehensive market research to gauge the car implementation timing, styling and manufacturing trend in the process of project planning. It was also found that benchmarking exercise was carried out on already released product and for future product. The study suggested various ways for method improvement such as through effective benchmarking process, audit of vendor capability, excellent computer facility, official endorsement of project planning and master schedule by related departmental heads and comprehensive market research. Universiti Teknologi Malaysia 2005-01 Article PeerReviewed application/pdf en http://eprints.utm.my/id/eprint/1122/1/AbuBakarAbdulHamid2005_%20VendorInvolvementandConcurrentEngineeringMethods.pdf Nik Mohamed, Nik Mohd. Zuki and Sastra, Hasan Yudie and Salit, Mohd. Sapuan and Ismail, Napsiah and Raj Arora, Prithivi and Abdul Hamid, Abu Bakar (2005) Vendor Involvement and Concurrent Engineering: Methods in Reducing Development Time For New Model in Automotive Industry. Jurnal Malaysia . pp. 17-23. ISSN 1675 - 1930 http://www.jurnal-kemanusiaan.utm.my/index.php/kemanusiaan/article/view/134 |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
language |
English |
description |
A study of method improvement to reduce development time for new model in automotive industry is presented in this paper. The approach taken is by studying the existing practice in car development. It was found that in the current practice of car development, project planning and master schedule were not officially endorsed by all related departmental heads, which resulted in too ambitious and unrealistic schedules. Other problem includes lack of comprehensive market research to gauge the car implementation timing, styling and manufacturing trend in the process of project planning. It was also found that benchmarking exercise was carried out on already released product and for future product. The study suggested various ways for method improvement such as through effective benchmarking process, audit of vendor capability, excellent computer facility, official endorsement of project planning and master schedule by related departmental heads and comprehensive market research. |
format |
Article |
author |
Nik Mohamed, Nik Mohd. Zuki Sastra, Hasan Yudie Salit, Mohd. Sapuan Ismail, Napsiah Raj Arora, Prithivi Abdul Hamid, Abu Bakar |
spellingShingle |
Nik Mohamed, Nik Mohd. Zuki Sastra, Hasan Yudie Salit, Mohd. Sapuan Ismail, Napsiah Raj Arora, Prithivi Abdul Hamid, Abu Bakar Vendor Involvement and Concurrent Engineering: Methods in Reducing Development Time For New Model in Automotive Industry |
author_facet |
Nik Mohamed, Nik Mohd. Zuki Sastra, Hasan Yudie Salit, Mohd. Sapuan Ismail, Napsiah Raj Arora, Prithivi Abdul Hamid, Abu Bakar |
author_sort |
Nik Mohamed, Nik Mohd. Zuki |
title |
Vendor Involvement and Concurrent Engineering: Methods in Reducing Development Time For New Model in Automotive Industry |
title_short |
Vendor Involvement and Concurrent Engineering: Methods in Reducing Development Time For New Model in Automotive Industry |
title_full |
Vendor Involvement and Concurrent Engineering: Methods in Reducing Development Time For New Model in Automotive Industry |
title_fullStr |
Vendor Involvement and Concurrent Engineering: Methods in Reducing Development Time For New Model in Automotive Industry |
title_full_unstemmed |
Vendor Involvement and Concurrent Engineering: Methods in Reducing Development Time For New Model in Automotive Industry |
title_sort |
vendor involvement and concurrent engineering: methods in reducing development time for new model in automotive industry |
publisher |
Universiti Teknologi Malaysia |
publishDate |
2005 |
url |
http://eprints.utm.my/id/eprint/1122/1/AbuBakarAbdulHamid2005_%20VendorInvolvementandConcurrentEngineeringMethods.pdf http://eprints.utm.my/id/eprint/1122/ http://www.jurnal-kemanusiaan.utm.my/index.php/kemanusiaan/article/view/134 |
_version_ |
1643643262051811328 |