Work Improvement At A Car Manufacturing Company

Productivity has been identified as an important role in any organization, especially for manufacturing sectors to gain more profit that leads to prosperity [1]. This paper reports a work improvement project in a car manufacturing company. It involves problem identification at the metal finish line...

Full description

Saved in:
Bibliographic Details
Main Authors: Mat Saman, Muhamad Zameri, Law, Cheak Ying
Format: Article
Language:English
Published: Penerbit UTM Press 2002
Subjects:
Online Access:http://eprints.utm.my/id/eprint/1325/1/JT37A6.pdf
http://eprints.utm.my/id/eprint/1325/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English
id my.utm.1325
record_format eprints
spelling my.utm.13252017-11-01T04:17:43Z http://eprints.utm.my/id/eprint/1325/ Work Improvement At A Car Manufacturing Company Mat Saman, Muhamad Zameri Law, Cheak Ying TS Manufactures Productivity has been identified as an important role in any organization, especially for manufacturing sectors to gain more profit that leads to prosperity [1]. This paper reports a work improvement project in a car manufacturing company. It involves problem identification at the metal finish line and proposing recommendation to improve the current situation more efficiently. Based on the observation and data online work-in-progress (WIP) has been identified as a major problem and this is caused by the insufficient movements due to material handlings and unbalanced workload. Method improvement technique is used to determine the best method of carrying out a task in order to eliminate the unnecessary movements. Then, line-balancing technique is used to minimize the idle time at every station or the percentage of line balance loss (LBL). In order to verify the results that were obtained from the generated line-balancing alternative, Witness simulation package is used to obtain the output. One effective alternative is chosen based on the results obtained from the simulation and cost justification. Then, a proper planning is suggested to maximize the resource utilization at the metal finish line. Simulation results showed that productivity increases roughly three times higher than the current situation. However, the results were obtained based on several assumptions that had been made during carry out this project. Penerbit UTM Press 2002-12 Article PeerReviewed application/pdf en http://eprints.utm.my/id/eprint/1325/1/JT37A6.pdf Mat Saman, Muhamad Zameri and Law, Cheak Ying (2002) Work Improvement At A Car Manufacturing Company. Jurnal Teknologi A (37A). pp. 73-87. ISSN 0127-9696
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TS Manufactures
spellingShingle TS Manufactures
Mat Saman, Muhamad Zameri
Law, Cheak Ying
Work Improvement At A Car Manufacturing Company
description Productivity has been identified as an important role in any organization, especially for manufacturing sectors to gain more profit that leads to prosperity [1]. This paper reports a work improvement project in a car manufacturing company. It involves problem identification at the metal finish line and proposing recommendation to improve the current situation more efficiently. Based on the observation and data online work-in-progress (WIP) has been identified as a major problem and this is caused by the insufficient movements due to material handlings and unbalanced workload. Method improvement technique is used to determine the best method of carrying out a task in order to eliminate the unnecessary movements. Then, line-balancing technique is used to minimize the idle time at every station or the percentage of line balance loss (LBL). In order to verify the results that were obtained from the generated line-balancing alternative, Witness simulation package is used to obtain the output. One effective alternative is chosen based on the results obtained from the simulation and cost justification. Then, a proper planning is suggested to maximize the resource utilization at the metal finish line. Simulation results showed that productivity increases roughly three times higher than the current situation. However, the results were obtained based on several assumptions that had been made during carry out this project.
format Article
author Mat Saman, Muhamad Zameri
Law, Cheak Ying
author_facet Mat Saman, Muhamad Zameri
Law, Cheak Ying
author_sort Mat Saman, Muhamad Zameri
title Work Improvement At A Car Manufacturing Company
title_short Work Improvement At A Car Manufacturing Company
title_full Work Improvement At A Car Manufacturing Company
title_fullStr Work Improvement At A Car Manufacturing Company
title_full_unstemmed Work Improvement At A Car Manufacturing Company
title_sort work improvement at a car manufacturing company
publisher Penerbit UTM Press
publishDate 2002
url http://eprints.utm.my/id/eprint/1325/1/JT37A6.pdf
http://eprints.utm.my/id/eprint/1325/
_version_ 1643643302515310592