Identifying energy saving opportunities in a process plant through preliminary energy audit
Improving plant energy efficiency requires monitoring, analysis and adjustments of the appropriate plant operating parameters and in some cases, plant modifications. This involves studies of plant energy distribution and the corresponding losses associated with the various uses of energy. The scope...
Saved in:
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit UTM Press
2003
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/1452/1/JT38A%5B4%5D.pdf http://eprints.utm.my/id/eprint/1452/ http://www.penerbit.utm.my/onlinejournal/38/A/JT38A4.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
Language: | English |
id |
my.utm.1452 |
---|---|
record_format |
eprints |
spelling |
my.utm.14522017-11-01T04:17:40Z http://eprints.utm.my/id/eprint/1452/ Identifying energy saving opportunities in a process plant through preliminary energy audit Abdul Manan, Zainuddin TD Environmental technology. Sanitary engineering Improving plant energy efficiency requires monitoring, analysis and adjustments of the appropriate plant operating parameters and in some cases, plant modifications. This involves studies of plant energy distribution and the corresponding losses associated with the various uses of energy. The scope and duration of a study may vary depending on the complexity of a plant and various operational requirements and constraints. The recommended practice is to run a preliminary energy audit on a plant before conducting a detailed retrofit project. Such exercise helps plant managers to differentiate between the immediate energy saving potentials from those requiring either some investments or further studies. This paper outlines the methodology and the scope involved in a preliminary study to improve overall plant energy efficiency. The procedure includes plant familiarization, data collection and parameter measurement, analysis of energy consumption and losses in the various sections of a process plant, analysis of the results and recommendation of measures supported by economic justifications. Examples of studies completed for two different plants are also presented. Penerbit UTM Press 2003-06 Article PeerReviewed application/pdf en http://eprints.utm.my/id/eprint/1452/1/JT38A%5B4%5D.pdf Abdul Manan, Zainuddin (2003) Identifying energy saving opportunities in a process plant through preliminary energy audit. Jurnal Teknologi A (38A). pp. 37-48. ISSN 0127-9696 http://www.penerbit.utm.my/onlinejournal/38/A/JT38A4.pdf |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
language |
English |
topic |
TD Environmental technology. Sanitary engineering |
spellingShingle |
TD Environmental technology. Sanitary engineering Abdul Manan, Zainuddin Identifying energy saving opportunities in a process plant through preliminary energy audit |
description |
Improving plant energy efficiency requires monitoring, analysis and adjustments of the appropriate plant operating parameters and in some cases, plant modifications. This involves studies of plant energy distribution and the corresponding losses associated with the various uses of energy. The scope and duration of a study may vary depending on the complexity of a plant and various operational requirements and constraints. The recommended practice is to run a preliminary energy audit on a plant before conducting a detailed retrofit project. Such exercise helps plant managers to differentiate between the immediate energy saving potentials from those requiring either some investments or further studies. This paper outlines the methodology and the scope involved in a preliminary study to improve overall plant energy efficiency. The procedure includes plant familiarization, data collection and parameter measurement, analysis of energy consumption and losses in the various sections of a process plant, analysis of the results and recommendation of measures supported by economic justifications. Examples of studies completed for two different plants are also presented. |
format |
Article |
author |
Abdul Manan, Zainuddin |
author_facet |
Abdul Manan, Zainuddin |
author_sort |
Abdul Manan, Zainuddin |
title |
Identifying energy saving opportunities in a process plant through preliminary energy audit |
title_short |
Identifying energy saving opportunities in a process plant through preliminary energy audit |
title_full |
Identifying energy saving opportunities in a process plant through preliminary energy audit |
title_fullStr |
Identifying energy saving opportunities in a process plant through preliminary energy audit |
title_full_unstemmed |
Identifying energy saving opportunities in a process plant through preliminary energy audit |
title_sort |
identifying energy saving opportunities in a process plant through preliminary energy audit |
publisher |
Penerbit UTM Press |
publishDate |
2003 |
url |
http://eprints.utm.my/id/eprint/1452/1/JT38A%5B4%5D.pdf http://eprints.utm.my/id/eprint/1452/ http://www.penerbit.utm.my/onlinejournal/38/A/JT38A4.pdf |
_version_ |
1643643339185061888 |