Improving off - site infrastructure provision through the Planning Approval System in peninsular Malaysia

The scarcity of financial sources has caused local authorities to no longer remain as the single providers of off-site local infrastructure. This has forced them to diversify and identify new methods to accommodate the provision. This has raised the need for the present practice to be reformed in or...

Full description

Saved in:
Bibliographic Details
Main Author: Salleh, Dani
Format: Thesis
Language:English
Published: 2009
Subjects:
Online Access:http://eprints.utm.my/id/eprint/16960/1/DaniSallehPFAB2009.pdf
http://eprints.utm.my/id/eprint/16960/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English
id my.utm.16960
record_format eprints
spelling my.utm.169602018-06-26T07:52:31Z http://eprints.utm.my/id/eprint/16960/ Improving off - site infrastructure provision through the Planning Approval System in peninsular Malaysia Salleh, Dani HG Finance QA75 Electronic computers. Computer science The scarcity of financial sources has caused local authorities to no longer remain as the single providers of off-site local infrastructure. This has forced them to diversify and identify new methods to accommodate the provision. This has raised the need for the present practice to be reformed in order to involve the private sector. This research examines the possibility of applying planning approval system to secure off-site infrastructure from the private sector. To achieve the objective, the research used both qualitative and quantitative methods to identify the hindering factors of the present practice of off-site infrastructure provision. The findings showed that most off-site infrastructure provisions were delivered by public sector. The private sector delivery was only evident in large-scale development. The responsibility to provide off-site infrastructure now falls under the mutual responsibility of both private and public sectors. In addition, the development plans has played a significant role in terms of the mechanism in coordinating new development with adequate provisions of off-site infrastructure. The tendency of private sector to contribute off-site infrastructure is influenced by the cost of development. The main issues of private involvement in local infrastructure provision (off-site) are caused by the inconsistency of the conditions imposed by local authorities to justify the requirements of off-site infrastructure. The findings propose the practice of off-site infrastructure provision to be clearly defined and standardised. The study revealed that planning approval system can be used to provide off-site infrastructure by private sector through negotiation with approving local authority as the most acceptable approach. However, it requires further investigations to detail how the framework of negotiations should be outlined and the structure to be applied. The implications of the findings have shown that the system should be improved by integrating the element of negotiations as alternative means in considering planning approvals and the types of infrastructure delivery should be diversified to include Build Operate and Transfer (BOT), Public-Private Partnership (PPP), Private Finance Initiative (PFI) and other methods of private delivery. The basis to seek contributions from private sector should be properly established and local authority therefore shall establish an Integrated Planning Approval System which enables them to distribute costs of providing infrastructure to potential users. 2009 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/16960/1/DaniSallehPFAB2009.pdf Salleh, Dani (2009) Improving off - site infrastructure provision through the Planning Approval System in peninsular Malaysia. PhD thesis, Universiti Teknologi Malaysia, Faculty of Built Environment.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic HG Finance
QA75 Electronic computers. Computer science
spellingShingle HG Finance
QA75 Electronic computers. Computer science
Salleh, Dani
Improving off - site infrastructure provision through the Planning Approval System in peninsular Malaysia
description The scarcity of financial sources has caused local authorities to no longer remain as the single providers of off-site local infrastructure. This has forced them to diversify and identify new methods to accommodate the provision. This has raised the need for the present practice to be reformed in order to involve the private sector. This research examines the possibility of applying planning approval system to secure off-site infrastructure from the private sector. To achieve the objective, the research used both qualitative and quantitative methods to identify the hindering factors of the present practice of off-site infrastructure provision. The findings showed that most off-site infrastructure provisions were delivered by public sector. The private sector delivery was only evident in large-scale development. The responsibility to provide off-site infrastructure now falls under the mutual responsibility of both private and public sectors. In addition, the development plans has played a significant role in terms of the mechanism in coordinating new development with adequate provisions of off-site infrastructure. The tendency of private sector to contribute off-site infrastructure is influenced by the cost of development. The main issues of private involvement in local infrastructure provision (off-site) are caused by the inconsistency of the conditions imposed by local authorities to justify the requirements of off-site infrastructure. The findings propose the practice of off-site infrastructure provision to be clearly defined and standardised. The study revealed that planning approval system can be used to provide off-site infrastructure by private sector through negotiation with approving local authority as the most acceptable approach. However, it requires further investigations to detail how the framework of negotiations should be outlined and the structure to be applied. The implications of the findings have shown that the system should be improved by integrating the element of negotiations as alternative means in considering planning approvals and the types of infrastructure delivery should be diversified to include Build Operate and Transfer (BOT), Public-Private Partnership (PPP), Private Finance Initiative (PFI) and other methods of private delivery. The basis to seek contributions from private sector should be properly established and local authority therefore shall establish an Integrated Planning Approval System which enables them to distribute costs of providing infrastructure to potential users.
format Thesis
author Salleh, Dani
author_facet Salleh, Dani
author_sort Salleh, Dani
title Improving off - site infrastructure provision through the Planning Approval System in peninsular Malaysia
title_short Improving off - site infrastructure provision through the Planning Approval System in peninsular Malaysia
title_full Improving off - site infrastructure provision through the Planning Approval System in peninsular Malaysia
title_fullStr Improving off - site infrastructure provision through the Planning Approval System in peninsular Malaysia
title_full_unstemmed Improving off - site infrastructure provision through the Planning Approval System in peninsular Malaysia
title_sort improving off - site infrastructure provision through the planning approval system in peninsular malaysia
publishDate 2009
url http://eprints.utm.my/id/eprint/16960/1/DaniSallehPFAB2009.pdf
http://eprints.utm.my/id/eprint/16960/
_version_ 1643646688310591488