Buildability in bridge construction : case study of Sungai Johor cable-stayed bridge

Nowadays, construction projects are becoming much more complex and difficult which include the bridge project. Thus, delay in project duration and overrun in project cost becomes a common occurrence which sometime the quality and safety aspect also been affected. Previous studies show that one of th...

Full description

Saved in:
Bibliographic Details
Main Author: Zahidi, Mardiyah
Format: Thesis
Language:English
Published: 2009
Subjects:
Online Access:http://eprints.utm.my/id/eprint/18183/1/MardiyahZahidiMFKA2009.pdf
http://eprints.utm.my/id/eprint/18183/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English
id my.utm.18183
record_format eprints
spelling my.utm.181832018-06-26T08:32:54Z http://eprints.utm.my/id/eprint/18183/ Buildability in bridge construction : case study of Sungai Johor cable-stayed bridge Zahidi, Mardiyah TA Engineering (General). Civil engineering (General) Nowadays, construction projects are becoming much more complex and difficult which include the bridge project. Thus, delay in project duration and overrun in project cost becomes a common occurrence which sometime the quality and safety aspect also been affected. Previous studies show that one of the contributing factors is the weaknesses of design produced by the designer. Meanwhile, buildability is the extent to which the design of a building facilitates ease of construction, subject to the overall requirements for the completed building. This study identified the problems occurred in one case study, Sungai Johor cable-stayed Bridge, that was conducted through site visit, interviews and questionnaire. Then, the problems were categorized into design related and non-design related problems. From the case study, it showed that the number of identified design related and non-design related problems are almost similar in form of number of occurrence. The case study also revealed that the impact of poor buildability is severe toward cost and duration ofproject, followed by quality. Other impacts which are less significant include safety and environment. This study has successfully established design phase buildability guideline for cable-stayed bridge construction. The guideline will help the construction people to ensure the implementation of buildability concept in their project and improve the project performance. 2009 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/18183/1/MardiyahZahidiMFKA2009.pdf Zahidi, Mardiyah (2009) Buildability in bridge construction : case study of Sungai Johor cable-stayed bridge. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Zahidi, Mardiyah
Buildability in bridge construction : case study of Sungai Johor cable-stayed bridge
description Nowadays, construction projects are becoming much more complex and difficult which include the bridge project. Thus, delay in project duration and overrun in project cost becomes a common occurrence which sometime the quality and safety aspect also been affected. Previous studies show that one of the contributing factors is the weaknesses of design produced by the designer. Meanwhile, buildability is the extent to which the design of a building facilitates ease of construction, subject to the overall requirements for the completed building. This study identified the problems occurred in one case study, Sungai Johor cable-stayed Bridge, that was conducted through site visit, interviews and questionnaire. Then, the problems were categorized into design related and non-design related problems. From the case study, it showed that the number of identified design related and non-design related problems are almost similar in form of number of occurrence. The case study also revealed that the impact of poor buildability is severe toward cost and duration ofproject, followed by quality. Other impacts which are less significant include safety and environment. This study has successfully established design phase buildability guideline for cable-stayed bridge construction. The guideline will help the construction people to ensure the implementation of buildability concept in their project and improve the project performance.
format Thesis
author Zahidi, Mardiyah
author_facet Zahidi, Mardiyah
author_sort Zahidi, Mardiyah
title Buildability in bridge construction : case study of Sungai Johor cable-stayed bridge
title_short Buildability in bridge construction : case study of Sungai Johor cable-stayed bridge
title_full Buildability in bridge construction : case study of Sungai Johor cable-stayed bridge
title_fullStr Buildability in bridge construction : case study of Sungai Johor cable-stayed bridge
title_full_unstemmed Buildability in bridge construction : case study of Sungai Johor cable-stayed bridge
title_sort buildability in bridge construction : case study of sungai johor cable-stayed bridge
publishDate 2009
url http://eprints.utm.my/id/eprint/18183/1/MardiyahZahidiMFKA2009.pdf
http://eprints.utm.my/id/eprint/18183/
_version_ 1643646824332918784