Implementing industrialised building system (IBS) in Malaysia: acceptance and awareness level, problems and strategies
Construction Industry Development Board (CIDB) has been actively promoting the use of Industrialised Building System (IBS) in Malaysian Construction Industry since 1998. Unfortunately, previous study was shown the use of IBS for building project in Malaysia only stands at 10% out of 50% as forecaste...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Faculty of Civil Engineering, UTM
2009
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/21040/1/MohamadIbrahimMohamad2009_ImplementingIndustrialisedBuildingSystem.pdf http://eprints.utm.my/id/eprint/21040/ http://civil.utm.my/mjce/files/2013/10/Implementing-Industrialised-Building-System-Ibs-In-Malaysia-Acceptance-And-Awareness-Level-Problems-And-Strategies.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
Language: | English |
id |
my.utm.21040 |
---|---|
record_format |
eprints |
spelling |
my.utm.210402017-10-13T10:20:56Z http://eprints.utm.my/id/eprint/21040/ Implementing industrialised building system (IBS) in Malaysia: acceptance and awareness level, problems and strategies Mohamad, Mohamad Ibrahim Zawawi, Mardhiah Nekooie, M. A. T Technology (General) TA Engineering (General). Civil engineering (General) Construction Industry Development Board (CIDB) has been actively promoting the use of Industrialised Building System (IBS) in Malaysian Construction Industry since 1998. Unfortunately, previous study was shown the use of IBS for building project in Malaysia only stands at 10% out of 50% as forecasted by CIDB in 2006. This research project explored the acceptance level of the current IBS implementation and existing problems faced by construction industry practitioners. It also identified suggestions to improve IBS implementation in Malaysia. The methods adopted for this study included interview and questionnaire survey. The study determined the level of IBS acceptance and awareness among Malaysian construction industry and analyzed root and frequent problems faced by the practitioners while implementing IBS. Based on the information gained, strategies to improve IBS implementation was suggested. Faculty of Civil Engineering, UTM 2009 Article PeerReviewed application/pdf en http://eprints.utm.my/id/eprint/21040/1/MohamadIbrahimMohamad2009_ImplementingIndustrialisedBuildingSystem.pdf Mohamad, Mohamad Ibrahim and Zawawi, Mardhiah and Nekooie, M. A. (2009) Implementing industrialised building system (IBS) in Malaysia: acceptance and awareness level, problems and strategies. Malaysian Journal of Civil Engineering, 21 (2). pp. 219-234. ISSN 1823-7843 http://civil.utm.my/mjce/files/2013/10/Implementing-Industrialised-Building-System-Ibs-In-Malaysia-Acceptance-And-Awareness-Level-Problems-And-Strategies.pdf |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
language |
English |
topic |
T Technology (General) TA Engineering (General). Civil engineering (General) |
spellingShingle |
T Technology (General) TA Engineering (General). Civil engineering (General) Mohamad, Mohamad Ibrahim Zawawi, Mardhiah Nekooie, M. A. Implementing industrialised building system (IBS) in Malaysia: acceptance and awareness level, problems and strategies |
description |
Construction Industry Development Board (CIDB) has been actively promoting the use of Industrialised Building System (IBS) in Malaysian Construction Industry since 1998. Unfortunately, previous study was shown the use of IBS for building project in Malaysia only stands at 10% out of 50% as forecasted by CIDB in 2006. This research project explored the acceptance level of the current IBS implementation and existing problems faced by construction industry practitioners. It also identified suggestions to improve IBS implementation in Malaysia. The methods adopted for this study included interview and questionnaire survey. The study determined the level of IBS acceptance and awareness among Malaysian construction industry and analyzed root and frequent problems faced by the practitioners while implementing IBS. Based on the information gained, strategies to improve IBS implementation was suggested. |
format |
Article |
author |
Mohamad, Mohamad Ibrahim Zawawi, Mardhiah Nekooie, M. A. |
author_facet |
Mohamad, Mohamad Ibrahim Zawawi, Mardhiah Nekooie, M. A. |
author_sort |
Mohamad, Mohamad Ibrahim |
title |
Implementing industrialised building system (IBS) in Malaysia: acceptance and awareness level, problems and strategies |
title_short |
Implementing industrialised building system (IBS) in Malaysia: acceptance and awareness level, problems and strategies |
title_full |
Implementing industrialised building system (IBS) in Malaysia: acceptance and awareness level, problems and strategies |
title_fullStr |
Implementing industrialised building system (IBS) in Malaysia: acceptance and awareness level, problems and strategies |
title_full_unstemmed |
Implementing industrialised building system (IBS) in Malaysia: acceptance and awareness level, problems and strategies |
title_sort |
implementing industrialised building system (ibs) in malaysia: acceptance and awareness level, problems and strategies |
publisher |
Faculty of Civil Engineering, UTM |
publishDate |
2009 |
url |
http://eprints.utm.my/id/eprint/21040/1/MohamadIbrahimMohamad2009_ImplementingIndustrialisedBuildingSystem.pdf http://eprints.utm.my/id/eprint/21040/ http://civil.utm.my/mjce/files/2013/10/Implementing-Industrialised-Building-System-Ibs-In-Malaysia-Acceptance-And-Awareness-Level-Problems-And-Strategies.pdf |
_version_ |
1643647252445528064 |