Executive information site management system for monitoring project performance: system requirement study

Progress monitoring and control is one of the most important tasks of managing projects. Basically, construction works produce a lot of information that are required by top managements to track the work progress at site. A recent issue highlighted by top managements is the inefficiency in obtaining...

Full description

Saved in:
Bibliographic Details
Main Authors: Abd. Majid, Muhd. Zaimi, Zakaria, Wan Zahran, Keyvanfar, Ali
Format: Article
Published: Social Science Electronic Publishing 2012
Subjects:
Online Access:http://eprints.utm.my/id/eprint/32677/
https://papers.ssrn.com/sol3/papers.cfm?abstract_id=1991370
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
id my.utm.32677
record_format eprints
spelling my.utm.326772019-03-26T08:07:50Z http://eprints.utm.my/id/eprint/32677/ Executive information site management system for monitoring project performance: system requirement study Abd. Majid, Muhd. Zaimi Zakaria, Wan Zahran Keyvanfar, Ali HD28 Management. Industrial Management TA Engineering (General). Civil engineering (General) Progress monitoring and control is one of the most important tasks of managing projects. Basically, construction works produce a lot of information that are required by top managements to track the work progress at site. A recent issue highlighted by top managements is the inefficiency in obtaining information from project sites on time. Hence, the focus of this research is to establish a computerized information system that can be utilized by top managements in order to evaluate the construction progress, known as Executive Information Site Monitoring System (EISMS). In order to develop EISMS, a Classic Waterfall Model has been considered as a basis for the system development whereby it began with identifying the system requirement followed by the system design (product design and detail design), coding, integration and finally the system testing and implementation. As relevancy to research field, this paper focuses on the development of system requirement. The research is presented in two study phases. In the first phase, initially it was conducted a descriptive survey study on “important futures”, followed by a descriptive study also on managerial priorities in Key Performance Indicators (KPI) of EISMS. The survey results “work progress” as the most “important features” for the system. Furthermore, the survey addresses managerial priorities on KPI to be emphasized in EISMS. As the study shows, development of the system requires three primary databases which include planned work schedule, 3D-CAD drawing, and actual work completion at site. In second phase, it is to elaborate propose EISMS framework model. Furthermore, it designed in a novel monitoring and control algorithm to track the “work progress”. Initially, it was to compute planned and actual work progress and thus the schedule variance at any selected specific date. Within this study, a trial based version of EISMS schedule variance analysis was implemented during the construction phase of one case study to investigate any shortcoming of a developed system in calculating schedule variance of project. Social Science Electronic Publishing 2012-01 Article PeerReviewed Abd. Majid, Muhd. Zaimi and Zakaria, Wan Zahran and Keyvanfar, Ali (2012) Executive information site management system for monitoring project performance: system requirement study. International Journal of Sustainable Development, 3 (3). pp. 11-24. ISSN 1923-6654 https://papers.ssrn.com/sol3/papers.cfm?abstract_id=1991370
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic HD28 Management. Industrial Management
TA Engineering (General). Civil engineering (General)
spellingShingle HD28 Management. Industrial Management
TA Engineering (General). Civil engineering (General)
Abd. Majid, Muhd. Zaimi
Zakaria, Wan Zahran
Keyvanfar, Ali
Executive information site management system for monitoring project performance: system requirement study
description Progress monitoring and control is one of the most important tasks of managing projects. Basically, construction works produce a lot of information that are required by top managements to track the work progress at site. A recent issue highlighted by top managements is the inefficiency in obtaining information from project sites on time. Hence, the focus of this research is to establish a computerized information system that can be utilized by top managements in order to evaluate the construction progress, known as Executive Information Site Monitoring System (EISMS). In order to develop EISMS, a Classic Waterfall Model has been considered as a basis for the system development whereby it began with identifying the system requirement followed by the system design (product design and detail design), coding, integration and finally the system testing and implementation. As relevancy to research field, this paper focuses on the development of system requirement. The research is presented in two study phases. In the first phase, initially it was conducted a descriptive survey study on “important futures”, followed by a descriptive study also on managerial priorities in Key Performance Indicators (KPI) of EISMS. The survey results “work progress” as the most “important features” for the system. Furthermore, the survey addresses managerial priorities on KPI to be emphasized in EISMS. As the study shows, development of the system requires three primary databases which include planned work schedule, 3D-CAD drawing, and actual work completion at site. In second phase, it is to elaborate propose EISMS framework model. Furthermore, it designed in a novel monitoring and control algorithm to track the “work progress”. Initially, it was to compute planned and actual work progress and thus the schedule variance at any selected specific date. Within this study, a trial based version of EISMS schedule variance analysis was implemented during the construction phase of one case study to investigate any shortcoming of a developed system in calculating schedule variance of project.
format Article
author Abd. Majid, Muhd. Zaimi
Zakaria, Wan Zahran
Keyvanfar, Ali
author_facet Abd. Majid, Muhd. Zaimi
Zakaria, Wan Zahran
Keyvanfar, Ali
author_sort Abd. Majid, Muhd. Zaimi
title Executive information site management system for monitoring project performance: system requirement study
title_short Executive information site management system for monitoring project performance: system requirement study
title_full Executive information site management system for monitoring project performance: system requirement study
title_fullStr Executive information site management system for monitoring project performance: system requirement study
title_full_unstemmed Executive information site management system for monitoring project performance: system requirement study
title_sort executive information site management system for monitoring project performance: system requirement study
publisher Social Science Electronic Publishing
publishDate 2012
url http://eprints.utm.my/id/eprint/32677/
https://papers.ssrn.com/sol3/papers.cfm?abstract_id=1991370
_version_ 1643649109791342592