Management of variation order in Public Work Department Malaysia construction project

Construction industry is frequently related with variation order and the project holders have to believe that no construction method is free of variation. A document review that was done on three (3) building and road construction projects in Public Works Department Malaysia during the period of Nin...

Full description

Saved in:
Bibliographic Details
Main Author: Amir Mohamed, Sharil Amran
Format: Thesis
Language:English
Published: 2013
Subjects:
Online Access:http://eprints.utm.my/id/eprint/33216/5/SharilAmranAmirMohamedMFKA2013.pdf
http://eprints.utm.my/id/eprint/33216/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English
id my.utm.33216
record_format eprints
spelling my.utm.332162017-09-12T06:13:13Z http://eprints.utm.my/id/eprint/33216/ Management of variation order in Public Work Department Malaysia construction project Amir Mohamed, Sharil Amran TH Building construction Construction industry is frequently related with variation order and the project holders have to believe that no construction method is free of variation. A document review that was done on three (3) building and road construction projects in Public Works Department Malaysia during the period of Ninth Malaysian Plan from 2006-2010 shows the poor management of variation order and cost overruns. In line with the problem identified, this study is coming up with the several objectives such as to identify the causes of variation, the effect of variation on project performance and to identify strategies to minimize them. The method of this study involved literature review, document study, interview and questionnaire. Based on the literature review, there are eight root causes of variation are found to be design errors, client requirement, contractor proposed change, construction change, discrepancies between work and statutory, extra work, design change and plan deficiency. Meanwhile, the effect of variation order as found in the study are cost overruns, time overruns, professional relations, delay in payment, increase overhead expenses, procurement delay, additional payment for contractor, progress effected without any delay, poor safety condition, dispute among professionals and completion schedule delay 2013-01 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/33216/5/SharilAmranAmirMohamedMFKA2013.pdf Amir Mohamed, Sharil Amran (2013) Management of variation order in Public Work Department Malaysia construction project. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Amir Mohamed, Sharil Amran
Management of variation order in Public Work Department Malaysia construction project
description Construction industry is frequently related with variation order and the project holders have to believe that no construction method is free of variation. A document review that was done on three (3) building and road construction projects in Public Works Department Malaysia during the period of Ninth Malaysian Plan from 2006-2010 shows the poor management of variation order and cost overruns. In line with the problem identified, this study is coming up with the several objectives such as to identify the causes of variation, the effect of variation on project performance and to identify strategies to minimize them. The method of this study involved literature review, document study, interview and questionnaire. Based on the literature review, there are eight root causes of variation are found to be design errors, client requirement, contractor proposed change, construction change, discrepancies between work and statutory, extra work, design change and plan deficiency. Meanwhile, the effect of variation order as found in the study are cost overruns, time overruns, professional relations, delay in payment, increase overhead expenses, procurement delay, additional payment for contractor, progress effected without any delay, poor safety condition, dispute among professionals and completion schedule delay
format Thesis
author Amir Mohamed, Sharil Amran
author_facet Amir Mohamed, Sharil Amran
author_sort Amir Mohamed, Sharil Amran
title Management of variation order in Public Work Department Malaysia construction project
title_short Management of variation order in Public Work Department Malaysia construction project
title_full Management of variation order in Public Work Department Malaysia construction project
title_fullStr Management of variation order in Public Work Department Malaysia construction project
title_full_unstemmed Management of variation order in Public Work Department Malaysia construction project
title_sort management of variation order in public work department malaysia construction project
publishDate 2013
url http://eprints.utm.my/id/eprint/33216/5/SharilAmranAmirMohamedMFKA2013.pdf
http://eprints.utm.my/id/eprint/33216/
_version_ 1643649265384292352