A study of contractor's procurement performance case: PT. Waskita Karya (Persero), Indonesia

Construction has become one industrial sector in Indonesia which gives a huge contribution to the national Gross Domestic Product (GDP). Construction markets are normally increasing in every year so that the sector becomes very attractive to the newcomer of the industry. This tendency then definitel...

Full description

Saved in:
Bibliographic Details
Main Author: Wibowo Soeharto, Mochamad Anugrah
Format: Thesis
Language:English
Published: 2012
Subjects:
Online Access:http://eprints.utm.my/id/eprint/33719/5/MochamadAnugrahWibowoMFAB2012.pdf
http://eprints.utm.my/id/eprint/33719/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:70505?site_name=Restricted Repository
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English
id my.utm.33719
record_format eprints
spelling my.utm.337192018-04-12T05:35:41Z http://eprints.utm.my/id/eprint/33719/ A study of contractor's procurement performance case: PT. Waskita Karya (Persero), Indonesia Wibowo Soeharto, Mochamad Anugrah TH Building construction Construction has become one industrial sector in Indonesia which gives a huge contribution to the national Gross Domestic Product (GDP). Construction markets are normally increasing in every year so that the sector becomes very attractive to the newcomer of the industry. This tendency then definitely makes the level of competition in such field becomes higher and gives rise for construction firm to initiate a better strategy to maintain their corporate growth and reputation. Project procurement which organized by particular client can be considered as a major opportunity and also the first step for construction company to earn revenues and promotion, so the performance of the company to succeed in this activity holds a very important role. Therefore, an initial step would require a proper and effective planning to obtain optimal results. While most of construction firms are only focus on their business activity to increase their value of sales as the indicator of successful performance. Without knowing their own unique selling point and capability, as the result, most of them are unable to maintain their growth, competitiveness and even business survival. Therefore, evaluation of past performance is one of the effective methods as to be a material aspect in order to formulate a better future strategy. The result of past performance will likely determine the company’s unique point and give rise to an opinion for the area which needs to be improved. This study will present the practical of past evaluation in procurement performance through case study. 2012-09 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/33719/5/MochamadAnugrahWibowoMFAB2012.pdf Wibowo Soeharto, Mochamad Anugrah (2012) A study of contractor's procurement performance case: PT. Waskita Karya (Persero), Indonesia. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:70505?site_name=Restricted Repository
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Wibowo Soeharto, Mochamad Anugrah
A study of contractor's procurement performance case: PT. Waskita Karya (Persero), Indonesia
description Construction has become one industrial sector in Indonesia which gives a huge contribution to the national Gross Domestic Product (GDP). Construction markets are normally increasing in every year so that the sector becomes very attractive to the newcomer of the industry. This tendency then definitely makes the level of competition in such field becomes higher and gives rise for construction firm to initiate a better strategy to maintain their corporate growth and reputation. Project procurement which organized by particular client can be considered as a major opportunity and also the first step for construction company to earn revenues and promotion, so the performance of the company to succeed in this activity holds a very important role. Therefore, an initial step would require a proper and effective planning to obtain optimal results. While most of construction firms are only focus on their business activity to increase their value of sales as the indicator of successful performance. Without knowing their own unique selling point and capability, as the result, most of them are unable to maintain their growth, competitiveness and even business survival. Therefore, evaluation of past performance is one of the effective methods as to be a material aspect in order to formulate a better future strategy. The result of past performance will likely determine the company’s unique point and give rise to an opinion for the area which needs to be improved. This study will present the practical of past evaluation in procurement performance through case study.
format Thesis
author Wibowo Soeharto, Mochamad Anugrah
author_facet Wibowo Soeharto, Mochamad Anugrah
author_sort Wibowo Soeharto, Mochamad Anugrah
title A study of contractor's procurement performance case: PT. Waskita Karya (Persero), Indonesia
title_short A study of contractor's procurement performance case: PT. Waskita Karya (Persero), Indonesia
title_full A study of contractor's procurement performance case: PT. Waskita Karya (Persero), Indonesia
title_fullStr A study of contractor's procurement performance case: PT. Waskita Karya (Persero), Indonesia
title_full_unstemmed A study of contractor's procurement performance case: PT. Waskita Karya (Persero), Indonesia
title_sort study of contractor's procurement performance case: pt. waskita karya (persero), indonesia
publishDate 2012
url http://eprints.utm.my/id/eprint/33719/5/MochamadAnugrahWibowoMFAB2012.pdf
http://eprints.utm.my/id/eprint/33719/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:70505?site_name=Restricted Repository
_version_ 1643649410476802048