Redesigning the project monitoring process : (Case Study : Pejabat Harta Bina, UTM)

Saved in:
Bibliographic Details
Main Author: Ismail, Rozana
Format: Thesis
Published: 2005
Subjects:
Online Access:http://eprints.utm.my/id/eprint/34958/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
id my.utm.34958
record_format eprints
spelling my.utm.349582013-10-17T01:28:48Z http://eprints.utm.my/id/eprint/34958/ Redesigning the project monitoring process : (Case Study : Pejabat Harta Bina, UTM) Ismail, Rozana Unspecified 2005 Thesis NonPeerReviewed Ismail, Rozana (2005) Redesigning the project monitoring process : (Case Study : Pejabat Harta Bina, UTM). Masters thesis, Universiti Teknologi Malaysia, Faculty of Computer Science and Information System.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic Unspecified
spellingShingle Unspecified
Ismail, Rozana
Redesigning the project monitoring process : (Case Study : Pejabat Harta Bina, UTM)
format Thesis
author Ismail, Rozana
author_facet Ismail, Rozana
author_sort Ismail, Rozana
title Redesigning the project monitoring process : (Case Study : Pejabat Harta Bina, UTM)
title_short Redesigning the project monitoring process : (Case Study : Pejabat Harta Bina, UTM)
title_full Redesigning the project monitoring process : (Case Study : Pejabat Harta Bina, UTM)
title_fullStr Redesigning the project monitoring process : (Case Study : Pejabat Harta Bina, UTM)
title_full_unstemmed Redesigning the project monitoring process : (Case Study : Pejabat Harta Bina, UTM)
title_sort redesigning the project monitoring process : (case study : pejabat harta bina, utm)
publishDate 2005
url http://eprints.utm.my/id/eprint/34958/
_version_ 1643649723047870464