A lesson from the Sedyatmo package 4 additional elevated lane toll road project

The construction of additional elevated lanes in the Prof. Dr. Ir. Sedyatmo Toll Road (Sedyatmo) on both its north and south sides was a fast track project to provide better accessibility to Jakarta’s International Airport Soekarno-Hatta and vice versa. Sedyatmo designed using pile slab bridge struc...

Full description

Saved in:
Bibliographic Details
Main Author: Tri Prakoso, Endar
Format: Thesis
Published: 2011
Subjects:
Online Access:http://eprints.utm.my/id/eprint/36710/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
id my.utm.36710
record_format eprints
spelling my.utm.367102020-02-18T03:35:51Z http://eprints.utm.my/id/eprint/36710/ A lesson from the Sedyatmo package 4 additional elevated lane toll road project Tri Prakoso, Endar HE Transportation and Communications The construction of additional elevated lanes in the Prof. Dr. Ir. Sedyatmo Toll Road (Sedyatmo) on both its north and south sides was a fast track project to provide better accessibility to Jakarta’s International Airport Soekarno-Hatta and vice versa. Sedyatmo designed using pile slab bridge structure. Pile slab bridge is a structure which consists of a reinforced concrete slab in one direction (one way slab) and supported by the pile group system. This structure has been tested for application and suitable for soft soil condition. In the phase of construction Sedyatmo, many factors challenges the Contractor to complete this project on time. Demand of toll road project in Indonesia nowdays is still promising. Challenges in optimizing design, cost and construction method of Sedyatmo should be a lesson learned when dealing with the next future project similar to Sedyatmo. The objectives of this study are to compare the design, cost and construction method of Sedyatmo and to suggest factors should be followed when dealing with the pile slab structure project similar to Sedyatmo. Three designs pile slab of Sedyatmo is Original Design, Propose Design and Review Design. Comparasion analysis are employed to compare these design, cost and construction method respectively. Qualitative analysis on key personnels Sedyatmo is conducted to search suggest factors. The analysis found that among those designs, the most desirable is Review Design. The analysis also suggest that factor construction resources are the most suggest factor which should be followed. It should be noted that the best alternatives found in this study are limited to Sedyatmo. If this lesson used, are applied for other projects, they may not yield the same results. This is mainly due to the uniqueness and circumstances of each project. 2011 Thesis NonPeerReviewed Tri Prakoso, Endar (2011) A lesson from the Sedyatmo package 4 additional elevated lane toll road project. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic HE Transportation and Communications
spellingShingle HE Transportation and Communications
Tri Prakoso, Endar
A lesson from the Sedyatmo package 4 additional elevated lane toll road project
description The construction of additional elevated lanes in the Prof. Dr. Ir. Sedyatmo Toll Road (Sedyatmo) on both its north and south sides was a fast track project to provide better accessibility to Jakarta’s International Airport Soekarno-Hatta and vice versa. Sedyatmo designed using pile slab bridge structure. Pile slab bridge is a structure which consists of a reinforced concrete slab in one direction (one way slab) and supported by the pile group system. This structure has been tested for application and suitable for soft soil condition. In the phase of construction Sedyatmo, many factors challenges the Contractor to complete this project on time. Demand of toll road project in Indonesia nowdays is still promising. Challenges in optimizing design, cost and construction method of Sedyatmo should be a lesson learned when dealing with the next future project similar to Sedyatmo. The objectives of this study are to compare the design, cost and construction method of Sedyatmo and to suggest factors should be followed when dealing with the pile slab structure project similar to Sedyatmo. Three designs pile slab of Sedyatmo is Original Design, Propose Design and Review Design. Comparasion analysis are employed to compare these design, cost and construction method respectively. Qualitative analysis on key personnels Sedyatmo is conducted to search suggest factors. The analysis found that among those designs, the most desirable is Review Design. The analysis also suggest that factor construction resources are the most suggest factor which should be followed. It should be noted that the best alternatives found in this study are limited to Sedyatmo. If this lesson used, are applied for other projects, they may not yield the same results. This is mainly due to the uniqueness and circumstances of each project.
format Thesis
author Tri Prakoso, Endar
author_facet Tri Prakoso, Endar
author_sort Tri Prakoso, Endar
title A lesson from the Sedyatmo package 4 additional elevated lane toll road project
title_short A lesson from the Sedyatmo package 4 additional elevated lane toll road project
title_full A lesson from the Sedyatmo package 4 additional elevated lane toll road project
title_fullStr A lesson from the Sedyatmo package 4 additional elevated lane toll road project
title_full_unstemmed A lesson from the Sedyatmo package 4 additional elevated lane toll road project
title_sort lesson from the sedyatmo package 4 additional elevated lane toll road project
publishDate 2011
url http://eprints.utm.my/id/eprint/36710/
_version_ 1662754241910931456