Time impact of scheduling simulation for high rise building

Although the long-introduced Industrialised Building System (IBS) has promised to solve and improve the current construction method and scenario in our country, but the IBS method has not gained enough popularity. One of the reasons is due to lack of research works done to quantifying the benefit of...

Full description

Saved in:
Bibliographic Details
Main Authors: Ismail, Asmadi, Mohamad, Mohamad Ibrahim, Yahya, Muhamad Azani
Format: Article
Language:English
Published: Universiti Tun Hussein Onn Malaysia (UTHM) and Concrete Society of Malaysia (CSM) 2010
Subjects:
Online Access:http://eprints.utm.my/id/eprint/39751/2/19
http://eprints.utm.my/id/eprint/39751/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English