Time impact of scheduling simulation for high rise building
Although the long-introduced Industrialised Building System (IBS) has promised to solve and improve the current construction method and scenario in our country, but the IBS method has not gained enough popularity. One of the reasons is due to lack of research works done to quantifying the benefit of...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universiti Tun Hussein Onn Malaysia (UTHM) and Concrete Society of Malaysia (CSM)
2010
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/39751/2/19 http://eprints.utm.my/id/eprint/39751/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
Language: | English |