Risk model for electrical and instrumentation installation for power generation system onboard ship
Installation of electrical and instrumentation of power generation system onboard ship is not without risk. Risks exist in many stages of the installation process and may lead to system failure. For decades it has been accepted by all the installation engineers representing the shipowner, the shipya...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/40600/5/MohdAzaharAliasMFKM2013.pdf http://eprints.utm.my/id/eprint/40600/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
Language: | English |