Analysis of factors of non-excusable delays that influence contractors' performance

Saved in:
Bibliographic Details
Main Author: Ng, Weng Seng
Format: Thesis
Published: 2001
Subjects:
Online Access:http://eprints.utm.my/id/eprint/43173/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
id my.utm.43173
record_format eprints
spelling my.utm.431732014-11-02T03:29:59Z http://eprints.utm.my/id/eprint/43173/ Analysis of factors of non-excusable delays that influence contractors' performance Ng, Weng Seng TH Building construction 2001 Thesis NonPeerReviewed Ng, Weng Seng (2001) Analysis of factors of non-excusable delays that influence contractors' performance. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic TH Building construction
spellingShingle TH Building construction
Ng, Weng Seng
Analysis of factors of non-excusable delays that influence contractors' performance
format Thesis
author Ng, Weng Seng
author_facet Ng, Weng Seng
author_sort Ng, Weng Seng
title Analysis of factors of non-excusable delays that influence contractors' performance
title_short Analysis of factors of non-excusable delays that influence contractors' performance
title_full Analysis of factors of non-excusable delays that influence contractors' performance
title_fullStr Analysis of factors of non-excusable delays that influence contractors' performance
title_full_unstemmed Analysis of factors of non-excusable delays that influence contractors' performance
title_sort analysis of factors of non-excusable delays that influence contractors' performance
publishDate 2001
url http://eprints.utm.my/id/eprint/43173/
_version_ 1643651113193308160