High rise building movement monitoring using RTK-GPS (case study: Menara Sarawak Enterprise)

The need for deformation surveys of large engineering structures such as long span bridges, dams and tall structures often arises from concerns associated with environmental protection, property damage and public safety. There are many high buildings nowadays, therefore it is very important to monit...

Full description

Saved in:
Bibliographic Details
Main Author: Shu, Kian Kok
Format: Thesis
Language:English
Published: 2005
Subjects:
Online Access:http://eprints.utm.my/id/eprint/4370/1/ShuKianKokMFKSG2005.pdf
http://eprints.utm.my/id/eprint/4370/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English
id my.utm.4370
record_format eprints
spelling my.utm.43702020-07-22T00:43:43Z http://eprints.utm.my/id/eprint/4370/ High rise building movement monitoring using RTK-GPS (case study: Menara Sarawak Enterprise) Shu, Kian Kok TA Engineering (General). Civil engineering (General) The need for deformation surveys of large engineering structures such as long span bridges, dams and tall structures often arises from concerns associated with environmental protection, property damage and public safety. There are many high buildings nowadays, therefore it is very important to monitor the buildings to ensure they are still under stable condition. Recently, the Global Positioning System (GPS) especially Real Time Kinematics (RTK-GPS) has emerged as a survey tool for many deformation applications. The RTK-GPS is carrier phase observation processed in real time, giving results such as position coordinates. This study highlights the concept and methodology of the continuous RTK-GPS and its potential application for high rise building monitoring surveys. The main objectives of this study are to study the ability and efficiency of the continuous RTK-GPS method in high rise building’ deformation detection and also to develop KFilter program for movement monitoring using Matlab v6.1 with Kalman Filter method. The GPS instruments’ calibrations had been carried out to ensure accuracy and reliability of the continuous RTK-GPS observation for high rise building movement monitoring. The surveys had been carried out on Menara Sarawak Enterprise, Johore Malaysia in two different epochs. Thus, the developed KFilter program is able to perform the movement monitoring analysis on the observed data to classify the stability of the building. The results of this study shows that the continuous RTK-GPS can provide 1cm and 2cm accuracy for horizontal and vertical respectively. The effectiveness of this technique depends on radio link communication whereby obstructions will cause the communication signal to fail. From the KFilter program analysis, the results shows that the Menara Sarawak Enterprise building is stable. The continuous RTK-GPS epoch 1 and epoch 2 analyses had shown the building is stable although displacement distance around 0.5cm and 1cm respectively are detected. 2005-12 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/4370/1/ShuKianKokMFKSG2005.pdf Shu, Kian Kok (2005) High rise building movement monitoring using RTK-GPS (case study: Menara Sarawak Enterprise). Masters thesis, Universiti Teknologi Malaysia, Faculty of Geoinformation Science and Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Shu, Kian Kok
High rise building movement monitoring using RTK-GPS (case study: Menara Sarawak Enterprise)
description The need for deformation surveys of large engineering structures such as long span bridges, dams and tall structures often arises from concerns associated with environmental protection, property damage and public safety. There are many high buildings nowadays, therefore it is very important to monitor the buildings to ensure they are still under stable condition. Recently, the Global Positioning System (GPS) especially Real Time Kinematics (RTK-GPS) has emerged as a survey tool for many deformation applications. The RTK-GPS is carrier phase observation processed in real time, giving results such as position coordinates. This study highlights the concept and methodology of the continuous RTK-GPS and its potential application for high rise building monitoring surveys. The main objectives of this study are to study the ability and efficiency of the continuous RTK-GPS method in high rise building’ deformation detection and also to develop KFilter program for movement monitoring using Matlab v6.1 with Kalman Filter method. The GPS instruments’ calibrations had been carried out to ensure accuracy and reliability of the continuous RTK-GPS observation for high rise building movement monitoring. The surveys had been carried out on Menara Sarawak Enterprise, Johore Malaysia in two different epochs. Thus, the developed KFilter program is able to perform the movement monitoring analysis on the observed data to classify the stability of the building. The results of this study shows that the continuous RTK-GPS can provide 1cm and 2cm accuracy for horizontal and vertical respectively. The effectiveness of this technique depends on radio link communication whereby obstructions will cause the communication signal to fail. From the KFilter program analysis, the results shows that the Menara Sarawak Enterprise building is stable. The continuous RTK-GPS epoch 1 and epoch 2 analyses had shown the building is stable although displacement distance around 0.5cm and 1cm respectively are detected.
format Thesis
author Shu, Kian Kok
author_facet Shu, Kian Kok
author_sort Shu, Kian Kok
title High rise building movement monitoring using RTK-GPS (case study: Menara Sarawak Enterprise)
title_short High rise building movement monitoring using RTK-GPS (case study: Menara Sarawak Enterprise)
title_full High rise building movement monitoring using RTK-GPS (case study: Menara Sarawak Enterprise)
title_fullStr High rise building movement monitoring using RTK-GPS (case study: Menara Sarawak Enterprise)
title_full_unstemmed High rise building movement monitoring using RTK-GPS (case study: Menara Sarawak Enterprise)
title_sort high rise building movement monitoring using rtk-gps (case study: menara sarawak enterprise)
publishDate 2005
url http://eprints.utm.my/id/eprint/4370/1/ShuKianKokMFKSG2005.pdf
http://eprints.utm.my/id/eprint/4370/
_version_ 1674066118109560832