Merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in Malaysia)
A midblock U-turn facility is often provided on multilane divided highway to manage direct right turn maneuvers from main stream. Mid block U-turn facility provides a safe turn for drivers who want to change their directions. As the number of vehicles in major road increase, the driver who wants to...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Conference or Workshop Item |
Published: |
2012
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/43948/ https://www.scientific.net/AMM.253-255.1876 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
id |
my.utm.43948 |
---|---|
record_format |
eprints |
spelling |
my.utm.439482017-07-27T02:26:04Z http://eprints.utm.my/id/eprint/43948/ Merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in Malaysia) Abbaszadehfallah, Iman Esmaeeli, Hamed Che Puan, Othman Hosseini, Seyed Hossein TA Engineering (General). Civil engineering (General) A midblock U-turn facility is often provided on multilane divided highway to manage direct right turn maneuvers from main stream. Mid block U-turn facility provides a safe turn for drivers who want to change their directions. As the number of vehicles in major road increase, the driver who wants to do U-turn faces more difficulties to find a suitable gap. This study is conducted to find a critical gap acceptance and empirical relationship between U-turning delay and volume on near-side traffic lane at midblock U-turn facility in multilane divided highway. Methodology of the study was observation and in order to have a precise data, video recording technique was used. Greenshields gap acceptance method was used to analyse the data. Through the collected data, a total of 916 rejected gaps and 810 accepted gaps were used for analyzing and results show that critical gap acceptance is 3.5 sec. Meanwhile, there is an empirical relationship between delay of U-turning and volume on nearside traffic lane on major road. 2012 Conference or Workshop Item PeerReviewed Abbaszadehfallah, Iman and Esmaeeli, Hamed and Che Puan, Othman and Hosseini, Seyed Hossein (2012) Merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in Malaysia). In: 2012 International Conference on Civil Engineering and Transportation, 2012. https://www.scientific.net/AMM.253-255.1876 |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Abbaszadehfallah, Iman Esmaeeli, Hamed Che Puan, Othman Hosseini, Seyed Hossein Merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in Malaysia) |
description |
A midblock U-turn facility is often provided on multilane divided highway to manage direct right turn maneuvers from main stream. Mid block U-turn facility provides a safe turn for drivers who want to change their directions. As the number of vehicles in major road increase, the driver who wants to do U-turn faces more difficulties to find a suitable gap. This study is conducted to find a critical gap acceptance and empirical relationship between U-turning delay and volume on near-side traffic lane at midblock U-turn facility in multilane divided highway. Methodology of the study was observation and in order to have a precise data, video recording technique was used. Greenshields gap acceptance method was used to analyse the data. Through the collected data, a total of 916 rejected gaps and 810 accepted gaps were used for analyzing and results show that critical gap acceptance is 3.5 sec. Meanwhile, there is an empirical relationship between delay of U-turning and volume on nearside traffic lane on major road. |
format |
Conference or Workshop Item |
author |
Abbaszadehfallah, Iman Esmaeeli, Hamed Che Puan, Othman Hosseini, Seyed Hossein |
author_facet |
Abbaszadehfallah, Iman Esmaeeli, Hamed Che Puan, Othman Hosseini, Seyed Hossein |
author_sort |
Abbaszadehfallah, Iman |
title |
Merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in Malaysia)
|
title_short |
Merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in Malaysia)
|
title_full |
Merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in Malaysia)
|
title_fullStr |
Merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in Malaysia)
|
title_full_unstemmed |
Merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in Malaysia)
|
title_sort |
merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in malaysia) |
publishDate |
2012 |
url |
http://eprints.utm.my/id/eprint/43948/ https://www.scientific.net/AMM.253-255.1876 |
_version_ |
1643651327335596032 |