Merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in Malaysia)

A midblock U-turn facility is often provided on multilane divided highway to manage direct right turn maneuvers from main stream. Mid block U-turn facility provides a safe turn for drivers who want to change their directions. As the number of vehicles in major road increase, the driver who wants to...

Full description

Saved in:
Bibliographic Details
Main Authors: Abbaszadehfallah, Iman, Esmaeeli, Hamed, Che Puan, Othman, Hosseini, Seyed Hossein
Format: Conference or Workshop Item
Published: 2012
Subjects:
Online Access:http://eprints.utm.my/id/eprint/43948/
https://www.scientific.net/AMM.253-255.1876
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
id my.utm.43948
record_format eprints
spelling my.utm.439482017-07-27T02:26:04Z http://eprints.utm.my/id/eprint/43948/ Merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in Malaysia) Abbaszadehfallah, Iman Esmaeeli, Hamed Che Puan, Othman Hosseini, Seyed Hossein TA Engineering (General). Civil engineering (General) A midblock U-turn facility is often provided on multilane divided highway to manage direct right turn maneuvers from main stream. Mid block U-turn facility provides a safe turn for drivers who want to change their directions. As the number of vehicles in major road increase, the driver who wants to do U-turn faces more difficulties to find a suitable gap. This study is conducted to find a critical gap acceptance and empirical relationship between U-turning delay and volume on near-side traffic lane at midblock U-turn facility in multilane divided highway. Methodology of the study was observation and in order to have a precise data, video recording technique was used. Greenshields gap acceptance method was used to analyse the data. Through the collected data, a total of 916 rejected gaps and 810 accepted gaps were used for analyzing and results show that critical gap acceptance is 3.5 sec. Meanwhile, there is an empirical relationship between delay of U-turning and volume on nearside traffic lane on major road. 2012 Conference or Workshop Item PeerReviewed Abbaszadehfallah, Iman and Esmaeeli, Hamed and Che Puan, Othman and Hosseini, Seyed Hossein (2012) Merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in Malaysia). In: 2012 International Conference on Civil Engineering and Transportation, 2012. https://www.scientific.net/AMM.253-255.1876
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Abbaszadehfallah, Iman
Esmaeeli, Hamed
Che Puan, Othman
Hosseini, Seyed Hossein
Merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in Malaysia)
description A midblock U-turn facility is often provided on multilane divided highway to manage direct right turn maneuvers from main stream. Mid block U-turn facility provides a safe turn for drivers who want to change their directions. As the number of vehicles in major road increase, the driver who wants to do U-turn faces more difficulties to find a suitable gap. This study is conducted to find a critical gap acceptance and empirical relationship between U-turning delay and volume on near-side traffic lane at midblock U-turn facility in multilane divided highway. Methodology of the study was observation and in order to have a precise data, video recording technique was used. Greenshields gap acceptance method was used to analyse the data. Through the collected data, a total of 916 rejected gaps and 810 accepted gaps were used for analyzing and results show that critical gap acceptance is 3.5 sec. Meanwhile, there is an empirical relationship between delay of U-turning and volume on nearside traffic lane on major road.
format Conference or Workshop Item
author Abbaszadehfallah, Iman
Esmaeeli, Hamed
Che Puan, Othman
Hosseini, Seyed Hossein
author_facet Abbaszadehfallah, Iman
Esmaeeli, Hamed
Che Puan, Othman
Hosseini, Seyed Hossein
author_sort Abbaszadehfallah, Iman
title Merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in Malaysia)
title_short Merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in Malaysia)
title_full Merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in Malaysia)
title_fullStr Merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in Malaysia)
title_full_unstemmed Merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in Malaysia)
title_sort merging gap acceptance at midblock u-turn facility (a case study on multilane divided highway in malaysia)
publishDate 2012
url http://eprints.utm.my/id/eprint/43948/
https://www.scientific.net/AMM.253-255.1876
_version_ 1643651327335596032