Nature of delay in nominated subcontracting

Construction delay is a results of occurrence beyond the control of either the contractor or the employer. Delay can be categorized as excusable, non-excusable, compensable and concurrent. There are many causes that can contribute delay in construction. However, delay in nominated subcontracting are...

Full description

Saved in:
Bibliographic Details
Main Author: Nasid Masrom, Md. Asrul
Format: Thesis
Language:English
Published: 2007
Subjects:
Online Access:http://eprints.utm.my/id/eprint/4439/1/MdAsrulNasidMFAB2007.pdf
http://eprints.utm.my/id/eprint/4439/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English