Effect of handling time to supply chain management in construction industry

Following its success in other sectors, the importance of supply chain management (SCM) has increasingly been recognized in the construction industry. Rationalization of activity in the supply chain process leads to a lowered production time and increased productivity. The instance of productivity i...

Full description

Saved in:
Bibliographic Details
Main Author: Omran Mohamed, Eyman A.
Format: Thesis
Published: 2014
Subjects:
Online Access:http://eprints.utm.my/id/eprint/48414/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
id my.utm.48414
record_format eprints
spelling my.utm.484142017-07-27T04:34:25Z http://eprints.utm.my/id/eprint/48414/ Effect of handling time to supply chain management in construction industry Omran Mohamed, Eyman A. HD Industries. Land use. Labor Following its success in other sectors, the importance of supply chain management (SCM) has increasingly been recognized in the construction industry. Rationalization of activity in the supply chain process leads to a lowered production time and increased productivity. The instance of productivity in the structure of supply chain in the organization of resources and material flows, in ways of taking up decisions. This thesis describes the introduction of supply system and effectiveness of a simulation modeling approach by using project simulation process in construction. The purpose of this project is to simulate the transportation process of precast component from the suppliers (vendors) to the construction sites. It is in order to determine the factors which effect on the transportation process time. The required data had been collected by sending a questionnaire to the selected case study. The simulation model built by using Witness 2004 software, to simulate the current state of the project supply chain and come with improvement for future improvement. Through results of optimization are minimizing the transportation and handling time by controlling the factors that effect on the process. The analysis of the research results can be used to indicate an improvement needed for the supply chain systems for construction project operations 2014 Thesis NonPeerReviewed Omran Mohamed, Eyman A. (2014) Effect of handling time to supply chain management in construction industry. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic HD Industries. Land use. Labor
spellingShingle HD Industries. Land use. Labor
Omran Mohamed, Eyman A.
Effect of handling time to supply chain management in construction industry
description Following its success in other sectors, the importance of supply chain management (SCM) has increasingly been recognized in the construction industry. Rationalization of activity in the supply chain process leads to a lowered production time and increased productivity. The instance of productivity in the structure of supply chain in the organization of resources and material flows, in ways of taking up decisions. This thesis describes the introduction of supply system and effectiveness of a simulation modeling approach by using project simulation process in construction. The purpose of this project is to simulate the transportation process of precast component from the suppliers (vendors) to the construction sites. It is in order to determine the factors which effect on the transportation process time. The required data had been collected by sending a questionnaire to the selected case study. The simulation model built by using Witness 2004 software, to simulate the current state of the project supply chain and come with improvement for future improvement. Through results of optimization are minimizing the transportation and handling time by controlling the factors that effect on the process. The analysis of the research results can be used to indicate an improvement needed for the supply chain systems for construction project operations
format Thesis
author Omran Mohamed, Eyman A.
author_facet Omran Mohamed, Eyman A.
author_sort Omran Mohamed, Eyman A.
title Effect of handling time to supply chain management in construction industry
title_short Effect of handling time to supply chain management in construction industry
title_full Effect of handling time to supply chain management in construction industry
title_fullStr Effect of handling time to supply chain management in construction industry
title_full_unstemmed Effect of handling time to supply chain management in construction industry
title_sort effect of handling time to supply chain management in construction industry
publishDate 2014
url http://eprints.utm.my/id/eprint/48414/
_version_ 1643652553163931648