Reverse logistic for industrial building system construction project

Industrialize Building System (IBS) is a manufacturing best practice that capable to interfere to market the construction. With the right product encouragement from Malaysian government, through its policies and regulations the IBS methods can flourish. However the construction industry players in M...

Full description

Saved in:
Bibliographic Details
Main Author: Buniya, Mohanad Kamil
Format: Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.utm.my/id/eprint/48870/25/MohanadKamilBuniyaMFKA2014.pdf
http://eprints.utm.my/id/eprint/48870/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:87884
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English
id my.utm.48870
record_format eprints
spelling my.utm.488702020-07-02T07:45:06Z http://eprints.utm.my/id/eprint/48870/ Reverse logistic for industrial building system construction project Buniya, Mohanad Kamil TH Building construction Industrialize Building System (IBS) is a manufacturing best practice that capable to interfere to market the construction. With the right product encouragement from Malaysian government, through its policies and regulations the IBS methods can flourish. However the construction industry players in Malaysia are still not rapidly embracing IBS due to numbers of barriers. Reverse logistic is the process of planning, implementing and controlling flows of raw materials, in process inventory, and finished goods, from a manufacturing, distribution, or use point to a point of recovery or point of proper disposal. The objectives of this study to identify the problems and challenges in reverse logistics and to find solutions to that problems on IBS projects. The data were collected through questionnaires and interviews. The questionnaire was done online and the respondents such as clients, consultants and the contractors, the data from the questionnaires were analyzed using the average index. The study focused on the cost effectiveness of IBS that can affected by the reverse logistic and there many problems can effect on reverse logistic, the reverse logistic can effect on IBS construction project in the form of cost, time and environment sustainability. 2014-08 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/48870/25/MohanadKamilBuniyaMFKA2014.pdf Buniya, Mohanad Kamil (2014) Reverse logistic for industrial building system construction project. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:87884
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Buniya, Mohanad Kamil
Reverse logistic for industrial building system construction project
description Industrialize Building System (IBS) is a manufacturing best practice that capable to interfere to market the construction. With the right product encouragement from Malaysian government, through its policies and regulations the IBS methods can flourish. However the construction industry players in Malaysia are still not rapidly embracing IBS due to numbers of barriers. Reverse logistic is the process of planning, implementing and controlling flows of raw materials, in process inventory, and finished goods, from a manufacturing, distribution, or use point to a point of recovery or point of proper disposal. The objectives of this study to identify the problems and challenges in reverse logistics and to find solutions to that problems on IBS projects. The data were collected through questionnaires and interviews. The questionnaire was done online and the respondents such as clients, consultants and the contractors, the data from the questionnaires were analyzed using the average index. The study focused on the cost effectiveness of IBS that can affected by the reverse logistic and there many problems can effect on reverse logistic, the reverse logistic can effect on IBS construction project in the form of cost, time and environment sustainability.
format Thesis
author Buniya, Mohanad Kamil
author_facet Buniya, Mohanad Kamil
author_sort Buniya, Mohanad Kamil
title Reverse logistic for industrial building system construction project
title_short Reverse logistic for industrial building system construction project
title_full Reverse logistic for industrial building system construction project
title_fullStr Reverse logistic for industrial building system construction project
title_full_unstemmed Reverse logistic for industrial building system construction project
title_sort reverse logistic for industrial building system construction project
publishDate 2014
url http://eprints.utm.my/id/eprint/48870/25/MohanadKamilBuniyaMFKA2014.pdf
http://eprints.utm.my/id/eprint/48870/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:87884
_version_ 1672610479374073856