Development of common work breakdown structure (WBS) for school project
A lot have been said about delayed school projects. Among the main factors that contribute to the problem are lacking of experience among the contractor, adopting non suitable and non detailed scheduling method for project monitoring. Ministry of Works and The Ministry of Education are two main bodi...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/4892/1/AzharAbdullahMFKA2006.pdf http://eprints.utm.my/id/eprint/4892/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
Language: | English |
Be the first to leave a comment!