Choice of alternative dispute resolutions in construction disputes

The adversarial natures of Construction Industry contribute construction disputes. This research aim to study Alternative Dispute Resolutions (ADRs) process and to propose the preferred ADRs that can minimise the time, cost and to preserve reputation and to propose enhancement criteria in current AD...

Full description

Saved in:
Bibliographic Details
Main Author: Abd. Halim, Fazzarieyyah
Format: Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.utm.my/id/eprint/48940/25/FazzarieyyahAbdHalimMFKA2014.pdf
http://eprints.utm.my/id/eprint/48940/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:85110
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English
id my.utm.48940
record_format eprints
spelling my.utm.489402020-07-08T03:16:33Z http://eprints.utm.my/id/eprint/48940/ Choice of alternative dispute resolutions in construction disputes Abd. Halim, Fazzarieyyah TA Engineering (General). Civil engineering (General) The adversarial natures of Construction Industry contribute construction disputes. This research aim to study Alternative Dispute Resolutions (ADRs) process and to propose the preferred ADRs that can minimise the time, cost and to preserve reputation and to propose enhancement criteria in current ADRs. Literature review was carried out and questionnaire was formulated and distributed to project participants in Johor Bahru. The data collected was analysed using Relative Important Index (RII). The analysis proved that from the null hypotheses variables tested, Negotiation matched 69% of the preferred resolution in the industry with some enhancement needed on this technique. The relationship and reputations rank the highest preference criteria with cost and duration fall on rank 10 and 11 respectively. Negotiation remains the most significant resolution method of construction disputes. 2014-08 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/48940/25/FazzarieyyahAbdHalimMFKA2014.pdf Abd. Halim, Fazzarieyyah (2014) Choice of alternative dispute resolutions in construction disputes. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:85110
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Abd. Halim, Fazzarieyyah
Choice of alternative dispute resolutions in construction disputes
description The adversarial natures of Construction Industry contribute construction disputes. This research aim to study Alternative Dispute Resolutions (ADRs) process and to propose the preferred ADRs that can minimise the time, cost and to preserve reputation and to propose enhancement criteria in current ADRs. Literature review was carried out and questionnaire was formulated and distributed to project participants in Johor Bahru. The data collected was analysed using Relative Important Index (RII). The analysis proved that from the null hypotheses variables tested, Negotiation matched 69% of the preferred resolution in the industry with some enhancement needed on this technique. The relationship and reputations rank the highest preference criteria with cost and duration fall on rank 10 and 11 respectively. Negotiation remains the most significant resolution method of construction disputes.
format Thesis
author Abd. Halim, Fazzarieyyah
author_facet Abd. Halim, Fazzarieyyah
author_sort Abd. Halim, Fazzarieyyah
title Choice of alternative dispute resolutions in construction disputes
title_short Choice of alternative dispute resolutions in construction disputes
title_full Choice of alternative dispute resolutions in construction disputes
title_fullStr Choice of alternative dispute resolutions in construction disputes
title_full_unstemmed Choice of alternative dispute resolutions in construction disputes
title_sort choice of alternative dispute resolutions in construction disputes
publishDate 2014
url http://eprints.utm.my/id/eprint/48940/25/FazzarieyyahAbdHalimMFKA2014.pdf
http://eprints.utm.my/id/eprint/48940/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:85110
_version_ 1674066137866829824