Effectiveness of pavement management system and its effects to the closing of final account in construction project in Malaysia

Federal roads maintenance needs a systematic and effective mechanism to ensure that the roads are in good condition and provide comfort to the road user. In implementing effective maintenance, budget is main the factor limiting this endeavor. Thus Public Works Department (PWD) Malaysia used Highway...

Full description

Saved in:
Bibliographic Details
Main Authors: Zakaria, Zarabizan, Ismail, Syuhaida, Md Yusof, Aminah
Format: Conference or Workshop Item
Published: 2013
Subjects:
Online Access:http://eprints.utm.my/id/eprint/51028/
http://dx.doi.org/10.1088/1742-6596/423/1/012034
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
id my.utm.51028
record_format eprints
spelling my.utm.510282017-07-27T00:47:30Z http://eprints.utm.my/id/eprint/51028/ Effectiveness of pavement management system and its effects to the closing of final account in construction project in Malaysia Zakaria, Zarabizan Ismail, Syuhaida Md Yusof, Aminah T Technology Federal roads maintenance needs a systematic and effective mechanism to ensure that the roads are in good condition and provide comfort to the road user. In implementing effective maintenance, budget is main the factor limiting this endeavor. Thus Public Works Department (PWD) Malaysia used Highway Development and Management (HDM-4) System to help the management of PWD Malaysia in determining the location and length of the road to be repaired according to the priority based on its analysis. For that purpose, PWD Malaysia has applied Pavement Management System (PMS) which utilizes HDM-4 as the analysis engine to conduct technical and economic analysis in generating annual work programs for pavement maintenance. As a result, a lot of feedback and comment have been received from Supervisory and Roads Maintenance Unit (UPPJ) Zonal on the accuracy of the system output and problems that arise in the closing of final account. Therefore, the objective of this paper is to evaluate current system accuracy in terms of generating the annual work program for periodic pavement maintenance, to identify factors contributing to the system inaccuracy in selecting the location and length of roads that require for treatment and to propose improvement measures for the system accuracy. The factors affecting the closing of final account caused by result received from the pavement management system are also defined. The scope of this paper is on the existing HDM-4 System which cover four states specifically Perlis, Selangor, Kelantan and Johor which is analysed via the work program output data for the purpose of evaluating the system accuracy. The method used in this paper includes case study, interview, discussion and analysis of the HDM-4 System output data. This paper has identified work history not updated and the analysis is not using the current data as factors contributing to the system accuracy. From the result of this paper, it is found that HDM-4's system accuracy used by PWD Malaysia attains average 65 per cent only and had not achieved level that had been set by PWD Malaysia namely 80 per cent. Hence, this paper has revealed the causes of the occurrances in the pavement management system in construction project in Malaysia and investigated the consequences of the late payments and final account problems confronted by contractors in Malaysia, which eventually proposed strategic actions that could be taken by the contractors in securing their payments. 2013 Conference or Workshop Item PeerReviewed Zakaria, Zarabizan and Ismail, Syuhaida and Md Yusof, Aminah (2013) Effectiveness of pavement management system and its effects to the closing of final account in construction project in Malaysia. In: International Conference on Science and Engineering in Mathematics, Chemistry and Physics (ScieTech), JAN 24-25, 2013, Jakarta, Indonesia. http://dx.doi.org/10.1088/1742-6596/423/1/012034
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic T Technology
spellingShingle T Technology
Zakaria, Zarabizan
Ismail, Syuhaida
Md Yusof, Aminah
Effectiveness of pavement management system and its effects to the closing of final account in construction project in Malaysia
description Federal roads maintenance needs a systematic and effective mechanism to ensure that the roads are in good condition and provide comfort to the road user. In implementing effective maintenance, budget is main the factor limiting this endeavor. Thus Public Works Department (PWD) Malaysia used Highway Development and Management (HDM-4) System to help the management of PWD Malaysia in determining the location and length of the road to be repaired according to the priority based on its analysis. For that purpose, PWD Malaysia has applied Pavement Management System (PMS) which utilizes HDM-4 as the analysis engine to conduct technical and economic analysis in generating annual work programs for pavement maintenance. As a result, a lot of feedback and comment have been received from Supervisory and Roads Maintenance Unit (UPPJ) Zonal on the accuracy of the system output and problems that arise in the closing of final account. Therefore, the objective of this paper is to evaluate current system accuracy in terms of generating the annual work program for periodic pavement maintenance, to identify factors contributing to the system inaccuracy in selecting the location and length of roads that require for treatment and to propose improvement measures for the system accuracy. The factors affecting the closing of final account caused by result received from the pavement management system are also defined. The scope of this paper is on the existing HDM-4 System which cover four states specifically Perlis, Selangor, Kelantan and Johor which is analysed via the work program output data for the purpose of evaluating the system accuracy. The method used in this paper includes case study, interview, discussion and analysis of the HDM-4 System output data. This paper has identified work history not updated and the analysis is not using the current data as factors contributing to the system accuracy. From the result of this paper, it is found that HDM-4's system accuracy used by PWD Malaysia attains average 65 per cent only and had not achieved level that had been set by PWD Malaysia namely 80 per cent. Hence, this paper has revealed the causes of the occurrances in the pavement management system in construction project in Malaysia and investigated the consequences of the late payments and final account problems confronted by contractors in Malaysia, which eventually proposed strategic actions that could be taken by the contractors in securing their payments.
format Conference or Workshop Item
author Zakaria, Zarabizan
Ismail, Syuhaida
Md Yusof, Aminah
author_facet Zakaria, Zarabizan
Ismail, Syuhaida
Md Yusof, Aminah
author_sort Zakaria, Zarabizan
title Effectiveness of pavement management system and its effects to the closing of final account in construction project in Malaysia
title_short Effectiveness of pavement management system and its effects to the closing of final account in construction project in Malaysia
title_full Effectiveness of pavement management system and its effects to the closing of final account in construction project in Malaysia
title_fullStr Effectiveness of pavement management system and its effects to the closing of final account in construction project in Malaysia
title_full_unstemmed Effectiveness of pavement management system and its effects to the closing of final account in construction project in Malaysia
title_sort effectiveness of pavement management system and its effects to the closing of final account in construction project in malaysia
publishDate 2013
url http://eprints.utm.my/id/eprint/51028/
http://dx.doi.org/10.1088/1742-6596/423/1/012034
_version_ 1643652917676212224