Performance improvement of concrete pouring process based resource utilization using Taguchi method and computer simulation

One of the most controversial issues in construction management is performance measurement. Construction managers are always involved in evaluation of resource changes which effect process performance. Due to limitations and also cost of resources, resource allocation has become a complex task in co...

Full description

Saved in:
Bibliographic Details
Main Authors: Zahraee, Seyed Mojib, Rezaei, Ghasem, Shahpanah, Ataollah, Chegeni, Ali, Mohd. Rohani, Jafri
Format: Article
Language:English
Published: Penerbit UTM 2014
Subjects:
Online Access:http://eprints.utm.my/id/eprint/54455/1/SeyedMojibZahraee2014_Performanceimprovementofconcrete.pdf
http://eprints.utm.my/id/eprint/54455/
http://dx.doi.org/10.11113/jt.v69.2225
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English
id my.utm.54455
record_format eprints
spelling my.utm.544552018-08-12T03:56:00Z http://eprints.utm.my/id/eprint/54455/ Performance improvement of concrete pouring process based resource utilization using Taguchi method and computer simulation Zahraee, Seyed Mojib Rezaei, Ghasem Shahpanah, Ataollah Chegeni, Ali Mohd. Rohani, Jafri TJ Mechanical engineering and machinery One of the most controversial issues in construction management is performance measurement. Construction managers are always involved in evaluation of resource changes which effect process performance. Due to limitations and also cost of resources, resource allocation has become a complex task in construction projects. To evaluate the effects of different resources on total project performance, managers strive to allocate limited resources by determining resource combinations. This paper aims at conducting Taguchi method along with computer simulation to determine the optimum combination of resources for a real world case study involving a concrete pouring operation in order to reduce cycle time and process costs. The proposed simulation model was conducted under Arena 13.9. Final result shows that the optimum resource combination will be achieved when all of resources are located in the low level. This means that number of trucks, spreader crew, vibrator crew and finisher crew should be equal to 3, 1, 1, and 1 respectively to improve the total performance Penerbit UTM 2014 Article PeerReviewed application/pdf en http://eprints.utm.my/id/eprint/54455/1/SeyedMojibZahraee2014_Performanceimprovementofconcrete.pdf Zahraee, Seyed Mojib and Rezaei, Ghasem and Shahpanah, Ataollah and Chegeni, Ali and Mohd. Rohani, Jafri (2014) Performance improvement of concrete pouring process based resource utilization using Taguchi method and computer simulation. Jurnal Teknologi (Sciences and Engineering), 69 (1). pp. 17-24. ISSN 2180-3722 http://dx.doi.org/10.11113/jt.v69.2225 DOI: 10.11113/jt.v69.2225
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TJ Mechanical engineering and machinery
spellingShingle TJ Mechanical engineering and machinery
Zahraee, Seyed Mojib
Rezaei, Ghasem
Shahpanah, Ataollah
Chegeni, Ali
Mohd. Rohani, Jafri
Performance improvement of concrete pouring process based resource utilization using Taguchi method and computer simulation
description One of the most controversial issues in construction management is performance measurement. Construction managers are always involved in evaluation of resource changes which effect process performance. Due to limitations and also cost of resources, resource allocation has become a complex task in construction projects. To evaluate the effects of different resources on total project performance, managers strive to allocate limited resources by determining resource combinations. This paper aims at conducting Taguchi method along with computer simulation to determine the optimum combination of resources for a real world case study involving a concrete pouring operation in order to reduce cycle time and process costs. The proposed simulation model was conducted under Arena 13.9. Final result shows that the optimum resource combination will be achieved when all of resources are located in the low level. This means that number of trucks, spreader crew, vibrator crew and finisher crew should be equal to 3, 1, 1, and 1 respectively to improve the total performance
format Article
author Zahraee, Seyed Mojib
Rezaei, Ghasem
Shahpanah, Ataollah
Chegeni, Ali
Mohd. Rohani, Jafri
author_facet Zahraee, Seyed Mojib
Rezaei, Ghasem
Shahpanah, Ataollah
Chegeni, Ali
Mohd. Rohani, Jafri
author_sort Zahraee, Seyed Mojib
title Performance improvement of concrete pouring process based resource utilization using Taguchi method and computer simulation
title_short Performance improvement of concrete pouring process based resource utilization using Taguchi method and computer simulation
title_full Performance improvement of concrete pouring process based resource utilization using Taguchi method and computer simulation
title_fullStr Performance improvement of concrete pouring process based resource utilization using Taguchi method and computer simulation
title_full_unstemmed Performance improvement of concrete pouring process based resource utilization using Taguchi method and computer simulation
title_sort performance improvement of concrete pouring process based resource utilization using taguchi method and computer simulation
publisher Penerbit UTM
publishDate 2014
url http://eprints.utm.my/id/eprint/54455/1/SeyedMojibZahraee2014_Performanceimprovementofconcrete.pdf
http://eprints.utm.my/id/eprint/54455/
http://dx.doi.org/10.11113/jt.v69.2225
_version_ 1643653522388942848