Wellbore pressure prediction after pipe connection operation in underbalanced drilling
In underbalanced drilling (UBD), bottom hole pressure (BHP) must be maintained in the defined limit. Maintaining underbalanced drilling conditions after pipe connection operation is required for the success of underbalanced drilling operations. Modeling and simulation of gas-liquid two phase flow in...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/54684/1/RezaCheraghiKootianiPFChE2015.pdf http://eprints.utm.my/id/eprint/54684/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:94672 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
Language: | English |