Employer's rights and contractor's liabilities in relation to construction defects after final certificate

Most of the standard forms of contract contain provisions dealing with defective works. Defective works could be in the forms of design fault, defective building materials or bad workmanships. Any defects, shrinkages or other faults arising during construction and defects liability period due to def...

Full description

Saved in:
Bibliographic Details
Main Author: Tan, Pei Ling
Format: Thesis
Language:English
Published: 2007
Subjects:
Online Access:http://eprints.utm.my/id/eprint/6662/1/TanPeiLingMFAB2007.pdf
http://eprints.utm.my/id/eprint/6662/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:62367
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English