On-site construction productivity in Malaysian infrastructure projects
Purpose: The purpose of this paper is to examine the factors constraining the on-site construction productivity and measures for its improvement in Malaysian construction industry. Design/methodology/approach: Questionnaire survey is administered to 171 respondents, comprising government authorities...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Published: |
Emerald Group Publishing Ltd.
2016
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/71718/ https://www.scopus.com/inward/record.uri?eid=2-s2.0-84997483387&doi=10.1108%2fSS-12-2015-0058&partnerID=40&md5=a48610b61905089d3483124ff14b83d5 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
id |
my.utm.71718 |
---|---|
record_format |
eprints |
spelling |
my.utm.717182017-11-20T08:46:14Z http://eprints.utm.my/id/eprint/71718/ On-site construction productivity in Malaysian infrastructure projects Durdyev, S. Ismail, S. T Technology (General) Purpose: The purpose of this paper is to examine the factors constraining the on-site construction productivity and measures for its improvement in Malaysian construction industry. Design/methodology/approach: Questionnaire survey is administered to 171 respondents, comprising government authorities and construction players. A total of 39 constraints are found to be significant factors in various risk levels. Findings: Consequently, improvement measures are recommended addressing those constraints to on-site construction productivity. It is believed that the findings of this study will assist in achieving high level of on-site construction productivity by focusing and acting upon the most risky constraints, where construction players in Malaysia could be guided well in their efforts in a time-, cost- and quality-effective manner. Originality/value: It is believed that the findings of this study will assist in achieving high level of on-site construction productivity by focusing and acting upon the most risky constraints, where construction players in Malaysia could be guided well in their efforts in a time-, cost- and quality-effective manner. Emerald Group Publishing Ltd. 2016 Article PeerReviewed Durdyev, S. and Ismail, S. (2016) On-site construction productivity in Malaysian infrastructure projects. Structural Survey, 34 (4-5). pp. 446-462. ISSN 0263-080X https://www.scopus.com/inward/record.uri?eid=2-s2.0-84997483387&doi=10.1108%2fSS-12-2015-0058&partnerID=40&md5=a48610b61905089d3483124ff14b83d5 |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
topic |
T Technology (General) |
spellingShingle |
T Technology (General) Durdyev, S. Ismail, S. On-site construction productivity in Malaysian infrastructure projects |
description |
Purpose: The purpose of this paper is to examine the factors constraining the on-site construction productivity and measures for its improvement in Malaysian construction industry. Design/methodology/approach: Questionnaire survey is administered to 171 respondents, comprising government authorities and construction players. A total of 39 constraints are found to be significant factors in various risk levels. Findings: Consequently, improvement measures are recommended addressing those constraints to on-site construction productivity. It is believed that the findings of this study will assist in achieving high level of on-site construction productivity by focusing and acting upon the most risky constraints, where construction players in Malaysia could be guided well in their efforts in a time-, cost- and quality-effective manner. Originality/value: It is believed that the findings of this study will assist in achieving high level of on-site construction productivity by focusing and acting upon the most risky constraints, where construction players in Malaysia could be guided well in their efforts in a time-, cost- and quality-effective manner. |
format |
Article |
author |
Durdyev, S. Ismail, S. |
author_facet |
Durdyev, S. Ismail, S. |
author_sort |
Durdyev, S. |
title |
On-site construction productivity in Malaysian infrastructure projects |
title_short |
On-site construction productivity in Malaysian infrastructure projects |
title_full |
On-site construction productivity in Malaysian infrastructure projects |
title_fullStr |
On-site construction productivity in Malaysian infrastructure projects |
title_full_unstemmed |
On-site construction productivity in Malaysian infrastructure projects |
title_sort |
on-site construction productivity in malaysian infrastructure projects |
publisher |
Emerald Group Publishing Ltd. |
publishDate |
2016 |
url |
http://eprints.utm.my/id/eprint/71718/ https://www.scopus.com/inward/record.uri?eid=2-s2.0-84997483387&doi=10.1108%2fSS-12-2015-0058&partnerID=40&md5=a48610b61905089d3483124ff14b83d5 |
_version_ |
1643656261722439680 |