Coordination of production scheduling and vehicle routing problem with due dates

This work presents a study on a problem of production and distribution planning. The problem considers a make-to-order production-distribution system with one manufacturer and many customers. The manufacturer (at the depot) produces the products once customer orders have been received. Distributions...

Full description

Saved in:
Bibliographic Details
Main Authors: Johar, F., Nordin, S. Z., Potts, C. N.
Format: Conference or Workshop Item
Published: American Institute of Physics Inc. 2016
Subjects:
Online Access:http://eprints.utm.my/id/eprint/73217/
https://www.scopus.com/inward/record.uri?eid=2-s2.0-84984578934&doi=10.1063%2f1.4954571&partnerID=40&md5=5c33a16a0eb3f1e89adc7c1c85fff08a
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
id my.utm.73217
record_format eprints
spelling my.utm.732172017-11-26T03:37:05Z http://eprints.utm.my/id/eprint/73217/ Coordination of production scheduling and vehicle routing problem with due dates Johar, F. Nordin, S. Z. Potts, C. N. QA Mathematics This work presents a study on a problem of production and distribution planning. The problem considers a make-to-order production-distribution system with one manufacturer and many customers. The manufacturer (at the depot) produces the products once customer orders have been received. Distributions to the customers associated with a set of orders should be done before the customer's due date to avoid any penalty for delay. The problem is the extension of the Vehicle Routing Problem with Release and Due Dates (VRPRDD) where deliveries start depending on the fix release dates. To achieve optimum efficiency in planning, it makes sense to coordinate production schedule with distribution planning. This is the subject of this study. The classical approach which treats these two planning sequentially is proposed, in which VNS is used as optimization method since it shows to be the most competent heuristic in the VRPRDD. The results shown that integrating production schedule and routing vehicle is significantly better compared to VRPRDD. American Institute of Physics Inc. 2016 Conference or Workshop Item PeerReviewed Johar, F. and Nordin, S. Z. and Potts, C. N. (2016) Coordination of production scheduling and vehicle routing problem with due dates. In: 23rd Malaysian National Symposium of Mathematical Sciences: Advances in Industrial and Applied Mathematics, SKSM 2015, 24 November 2015 through 26 November 2015, Johor Bahru; Malaysia. https://www.scopus.com/inward/record.uri?eid=2-s2.0-84984578934&doi=10.1063%2f1.4954571&partnerID=40&md5=5c33a16a0eb3f1e89adc7c1c85fff08a
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic QA Mathematics
spellingShingle QA Mathematics
Johar, F.
Nordin, S. Z.
Potts, C. N.
Coordination of production scheduling and vehicle routing problem with due dates
description This work presents a study on a problem of production and distribution planning. The problem considers a make-to-order production-distribution system with one manufacturer and many customers. The manufacturer (at the depot) produces the products once customer orders have been received. Distributions to the customers associated with a set of orders should be done before the customer's due date to avoid any penalty for delay. The problem is the extension of the Vehicle Routing Problem with Release and Due Dates (VRPRDD) where deliveries start depending on the fix release dates. To achieve optimum efficiency in planning, it makes sense to coordinate production schedule with distribution planning. This is the subject of this study. The classical approach which treats these two planning sequentially is proposed, in which VNS is used as optimization method since it shows to be the most competent heuristic in the VRPRDD. The results shown that integrating production schedule and routing vehicle is significantly better compared to VRPRDD.
format Conference or Workshop Item
author Johar, F.
Nordin, S. Z.
Potts, C. N.
author_facet Johar, F.
Nordin, S. Z.
Potts, C. N.
author_sort Johar, F.
title Coordination of production scheduling and vehicle routing problem with due dates
title_short Coordination of production scheduling and vehicle routing problem with due dates
title_full Coordination of production scheduling and vehicle routing problem with due dates
title_fullStr Coordination of production scheduling and vehicle routing problem with due dates
title_full_unstemmed Coordination of production scheduling and vehicle routing problem with due dates
title_sort coordination of production scheduling and vehicle routing problem with due dates
publisher American Institute of Physics Inc.
publishDate 2016
url http://eprints.utm.my/id/eprint/73217/
https://www.scopus.com/inward/record.uri?eid=2-s2.0-84984578934&doi=10.1063%2f1.4954571&partnerID=40&md5=5c33a16a0eb3f1e89adc7c1c85fff08a
_version_ 1643656606701846528