Development of waste-To-energy plant in Kuala Lumpur

The increasing of waste generation and its accumulation is alarming due to its potential negative effect on the well-being of the society and the integrity of environment sustainability. Waste generation in Kuala Lumpur is about 2,500 t/ d and is expected to increase to about 4,000 t/ d in 2020. The...

Full description

Saved in:
Bibliographic Details
Main Authors: Taib, M. R., Ho, W. S., Ng, P. S.
Format: Article
Published: Italian Association of Chemical Engineering - AIDIC 2017
Subjects:
Online Access:http://eprints.utm.my/id/eprint/75778/
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85019474094&doi=10.3303%2fCET1756207&partnerID=40&md5=20f20de7bb1f61e4738dccc07d4068fe
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
id my.utm.75778
record_format eprints
spelling my.utm.757782018-04-30T13:16:51Z http://eprints.utm.my/id/eprint/75778/ Development of waste-To-energy plant in Kuala Lumpur Taib, M. R. Ho, W. S. Ng, P. S. TP Chemical technology The increasing of waste generation and its accumulation is alarming due to its potential negative effect on the well-being of the society and the integrity of environment sustainability. Waste generation in Kuala Lumpur is about 2,500 t/ d and is expected to increase to about 4,000 t/ d in 2020. The waste is sent to Bukit Tagar Sanitary Landfill via Taman Beringin Transfer Station. The transfer station is overloaded with the design capacity of only 1,700 t/ d. The government of Malaysia has decided to construct a 1,200 t/d waste-To-energy (WtE) plant at Taman Beringin, which is adjacent to the transfer station. As the location is highly populated, the project might raise the concerns from nearby residents. This paper describes the project facilitating activities that have been conducted for the development of WtE plant in KL. The studies include technology selection, site assessment and soil investigation, public safety and health assessment, power system study and waste characteristics. The results of the studies are necessary for the decision making and approval by government agencies such as Department of Environment and local authority, as well as the design of WtE. Italian Association of Chemical Engineering - AIDIC 2017 Article PeerReviewed Taib, M. R. and Ho, W. S. and Ng, P. S. (2017) Development of waste-To-energy plant in Kuala Lumpur. Chemical Engineering Transactions, 56 . pp. 1237-1242. ISSN 2283-9216 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85019474094&doi=10.3303%2fCET1756207&partnerID=40&md5=20f20de7bb1f61e4738dccc07d4068fe
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic TP Chemical technology
spellingShingle TP Chemical technology
Taib, M. R.
Ho, W. S.
Ng, P. S.
Development of waste-To-energy plant in Kuala Lumpur
description The increasing of waste generation and its accumulation is alarming due to its potential negative effect on the well-being of the society and the integrity of environment sustainability. Waste generation in Kuala Lumpur is about 2,500 t/ d and is expected to increase to about 4,000 t/ d in 2020. The waste is sent to Bukit Tagar Sanitary Landfill via Taman Beringin Transfer Station. The transfer station is overloaded with the design capacity of only 1,700 t/ d. The government of Malaysia has decided to construct a 1,200 t/d waste-To-energy (WtE) plant at Taman Beringin, which is adjacent to the transfer station. As the location is highly populated, the project might raise the concerns from nearby residents. This paper describes the project facilitating activities that have been conducted for the development of WtE plant in KL. The studies include technology selection, site assessment and soil investigation, public safety and health assessment, power system study and waste characteristics. The results of the studies are necessary for the decision making and approval by government agencies such as Department of Environment and local authority, as well as the design of WtE.
format Article
author Taib, M. R.
Ho, W. S.
Ng, P. S.
author_facet Taib, M. R.
Ho, W. S.
Ng, P. S.
author_sort Taib, M. R.
title Development of waste-To-energy plant in Kuala Lumpur
title_short Development of waste-To-energy plant in Kuala Lumpur
title_full Development of waste-To-energy plant in Kuala Lumpur
title_fullStr Development of waste-To-energy plant in Kuala Lumpur
title_full_unstemmed Development of waste-To-energy plant in Kuala Lumpur
title_sort development of waste-to-energy plant in kuala lumpur
publisher Italian Association of Chemical Engineering - AIDIC
publishDate 2017
url http://eprints.utm.my/id/eprint/75778/
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85019474094&doi=10.3303%2fCET1756207&partnerID=40&md5=20f20de7bb1f61e4738dccc07d4068fe
_version_ 1643657157602705408